- 0
- 0
- 约6.57千字
- 约 33页
- 2022-05-30 发布于重庆
- 举报
Recommendations: It is suggested that the fencing on top of the wall be upgraded to a higher pro hinder scaling from the roofs of the housing area. Additionally, it is suggested BWIB not store materials or objects so close to the wall that enables the climbing over the wall/fence from inside the property. ? CORRECTIVE ACTION: Check and remove the materials or objects close to the wall. Audit 第三十一页,共三十三页。 Recommendations: BWIB be provided with an updated locking system throughout the brewery and a computerized record keeping system to track issuing and retrieval of keys and cores. ? CORR
您可能关注的文档
最近下载
- 标准图集-22G101-2现浇混凝土板式楼梯.pdf VIP
- 《3-02-03-01消防员职业标准》.pdf VIP
- 《NBT 31117-2017 海上风电场交流海底电缆选型敷设技术导则》(2026年)实施指南.pptx VIP
- NBT 31117-2017海上风电场交流海底电缆选型敷设技术导则专题研究报告.pptx VIP
- 家庭治疗家谱图绘制.pptx VIP
- 04S516 混凝土排水管道基础及接口.docx
- 2026年临床执业助理医师《药理学》测试卷(含答案).docx
- 李白按年龄顺序写的诗.docx VIP
- 1.数据宝藏在身边(课件)-四年级信息科技全一册(人教版2024).pptx VIP
- 二级医院呼吸与危重症医学科规范化建设标准.doc VIP
原创力文档

文档评论(0)