- 4
- 0
- 约3.14万字
- 约 29页
- 2022-08-17 发布于浙江
- 举报
德芙巧克力广告策划
德芙巧克力广告策划案
Dove chocolate advertising planning case
周玉娇
20100611106
广告设计与制作
management, logistical organization departments, as plane management fenpianbaogan management measures. Construction site according to cI criteria set six-figure. Quality policy, engineering, construction schedule and civilized construction in fenpianbaogan district, the quality control machinery, ... 5 from the general contractor, construction, water and electricity sources specify the locations to the construction area, set the outlet, located below the water professional water container volume in 2M3 for water, to prevent spills, water for both construction and can meet the requirements. Power supply from a professional lock box out, and established a secondary box set, construction from a second-tier box, wires hanging to the construction area. 1) erection of extension (1) cable distribution boxes shall have sleeves, wire in and out without confusion. Large capacity electric box upper inlet and drop pipe. (2) extension good insulation, non-aging, damage and leakage. (3) extension should be laid along the wall or pole overhead, fixed with insulators. (4) aisle wire can be buried and mark with hard protective casing. (5) rubber line overhead outdoor extension application, joints in tension and to comply with the insulation requirements. 2) lighting (1) General places 220V voltage. Lighting in hazardous, wet places, and metal containers and portable lighting, voltage should be used to meet the requirements of safety. (2) lighting wires insulator fixed. Prohibited the use of flowers or plastic resin line. Tie wires not pulled or anywhere on the scaffold. (3) lighting the metal casing must be grounded or neutral. Lighting switch box must be installed within the single phase circuit protector. (4) outdoor lighting from the ground shall not be less than 3M: Interior from the ground shall not be less than 2.4m. Tungsten
目录
一、德芙简介………………………………………………………… 3
(一)德芙简介……………………………………………
您可能关注的文档
最近下载
- PV3930- 氙灯老化试验标准.pdf VIP
- 2025年《反不正当竞争法》市场混淆行为案例分析及答案.docx
- 十堰教师招聘真题2023.docx VIP
- 动力工程及工程热物理专业英语.ppt VIP
- 自来水厂环评:清镇市莲花山自来水厂新建工程-迎燕水库配套水厂工程项目环评(2021年新版环评)环境影响报告表.pdf VIP
- 2025春人教版数学七下《第七章 数学活动》新版课件(23页).pptx VIP
- 工程项目标准化管理体系及措施要求.docx VIP
- 23S516混凝土排水管道基础及接口图集.pdf VIP
- 宪法学(第二版)(马克思主义理论研究和建设工程重点教材)课件第4章国家性质和国家形式.pptx VIP
- 中国旅游文化(全套课件).ppt VIP
原创力文档

文档评论(0)