《施工组织学》课程教学大纲.docxVIP

  • 7
  • 0
  • 约6.36千字
  • 约 8页
  • 2022-12-04 发布于上海
  • 举报
《施工组织学》教学大纲 一、课程基本信息 课程名称 施工组织学 Construction Organizing Theory 课程编码 SEM122511020 开课院部 经济管理学院 课程团队 施工组织学 学分 2.0 课内学时 32 讲授 32 实验 0 上机 0 实践 0 课外学时 32 适用专业 工程管理 授课语言 中文 先修课程 施工技术、工程项目管理 课程简介 (必修) 施工组织学是研究在社会主义市场经济条件下,工程项目施工阶段的统筹规划和实施管理的客观规律的一门综合性边缘学科,它需要运用建设法规、组织、技术、经济、合同、信息管理及计算机等各方面的专业知识,实践性很强。主要任务是针对各类不同的项目建设特点,结合具体自然环境条件、技术经济条件和现场施工条件,总结工程项目施工组织的基本原则和规律,从系统的观点出发研究施工项目的组织方式、施工方案、施工进度、资源配置、施工平面设计等施工规划设计方法,探讨施工生产过程中的技术、质量、进度、资源、现场、信息等动态管理的控制措施,以及计算机技术的应用,从而能高效低耗地完成建设项目的施工任务,以保证施工项目质量、工期、造价目标最优地实现。 Construction organization is a comprehensive marginal discipline that studies the objective laws of overall planning and implementation management in the construction phase of a project under the condition of socialist market economy. It requires the application of construction regulations, organizations, technologies, professional knowledge in economy, contract, information management and computer is very practical. The main task is to summarize the basic principles and rules of the construction organization of engineering projects according to the construction characteristics of various projects, combined with specific natural environment conditions, technical and economic conditions and site construction conditions, from a systematic point of view, this paper studies the construction planning and design methods such as the organization mode, construction scheme, construction progress, resource allocation, construction graphic design, etc. of the construction project, and discusses the technology, quality, progress, the control measures of dynamic management such as resources, site and information, as well as the application of computer technology, can complete the construction tasks of construction projects with high efficiency and low consumption, so as to ensure the quality, construction period and construction period of construction projects, the cost goal is best achieved. 负责人 大纲执笔人 审核人 二、课程目标 序号 代号 课程目标 OBE 毕业要求指标点 任务 自选 1 M1 目标1:掌握工程项目施工阶段的统筹规划和实施管理的一般规律 是 3.6 2 M2

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档