- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Shutting down the system
Buffers left in the system can precipitate and damage instrument components.
Buffers dissolved in water may precipitate
You may want to shut down the system between analyses, overnight or for a weekend, or for
72 hours or more.
Tip: If you are using Empower software to control the system, set system shutdown
parameters in the Instrument Method Editor. Consult the Empower Help for more information.
If you are using MassLynx software to control your system, set system shutdown parameters
in the Shutdown Editor. Consult the MassLynx Help for more information.
Between analyses
To shut down the system between analyses:
1. Between analyses, continue to pump the initial mobile phase mixture through the column.
This maintains the column equilibrium necessary for good retention time reproducibility.
2. If a few hours will pass before the next injection, slow the flow rate in the interim to a few
tenths of a mL/min to conserve solvent.
Tip: Ensure that Auto-Shutdown for your shutdown method is deactivated.
3. Keep the detector operating, and the column manager at operating temperature, during
this period.
Overnight or weekends
To shut down the system overnight or over a weekend:
1. Flush the column with 1:1 mixture of methanol/acetonitrile. This maintains the column bed
in an active, wetted state.
Requirement: If you are using buffers, you must first flush the column with a high water
content mobile phase (90% H2O). Then stop the pump flow.
2. If possible, extinguish the detector lamp to lengthen lamp life.
3. The column manager can operate overnight but should be shut down over the weekend.
Caution: The power switch on each system instrument controls the basic
operational state of that instrument. A portion of the instrument remains powered-
on after the instrument is switched off. To completely interrupt power to a system
instrument, set the power swit
您可能关注的文档
- 3355 TQS 超高效液相色谱串联质谱 2014-5-9.docx
- NuGenesis LMS安装和配置指南.pdf
- QDa 检测器概述和维护指南.pdf
- 沃特世仪器说明书沃特世仪器说明书masslynx安装指南.doc
- 沃特世仪器说明书QDa QC应用文集.pdf
- 沃特世仪器说明书Replace 2424 nebulizer.pdf
- 沃特世仪器说明书Replace 2424 Lamp.pdf
- 沃特世仪器说明书Rebuild 2998 flow cell.pdf
- 沃特世仪器说明书Plunger Seal Wash.pdf
- 沃特世仪器说明书Performance Maintenance.pdf
文档评论(0)