You can protect the master plan from any automatic changes to master 排程 items in the near future by using a planning time fence. During the planning run, the system makes no automatic changes to 订单 proposals within the planning time fence (which is specifically determined for every master 排程 item). The system always dynamically 计算s the end 日期 of the planning time fence starting from the planning 日期. You specify how the system is to determine the lot size by 选择ing one of the lot-sizing procedures in the material master record. The system uses the result of the lot-size calculation as the 数量 f
您可能关注的文档
最近下载
- 科学技术史课件.pptx VIP
- 科学技术史试题及答案汇总.pdf VIP
- 科学技术史试题库.docx VIP
- 问题链驱动的小学英语单元教学研究.docx VIP
- 科学技术史 复习 笔记 考研.doc VIP
- 科学技术史总结 考研 复习 背诵版.doc VIP
- Q_SY 1206.1-2009 油气管道通信系统通用技术规范第1部分:光传输系统.docx VIP
- Q_SY 201.1-2015 油气管道监控与数据采集系统通用技术规范 第1部分:功能设置.docx VIP
- YD 5012-2003 光缆线路对地绝缘指标及测试方法.pdf VIP
- OTIS奥的斯XIOTIS西子奥的斯ACD3-MRL电气原理图纸XAA21310AS.pdf
原创力文档

文档评论(0)