- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Design and budget of mobile communication engineeringEquipments layout requirementsCourse team: Xiaoji Zhao Xuelian Fang Yueqiu Dong Liu Yang SHENZHEN POLYTECHNIC
Contents 1Power equipment layout 2Wireless equipment layout 3Cable rack layout 4Other equipment layout
Switch power as close as possible to wireless cabinet;Switch power as far as possible against the wall ;The AC distribution panel is close to the AC introduction point, and the cable length between the two shall be less than 10 meters ;The battery pack is placed on the beam or separately against the wall, channel steel can be considered to be installed in order to distribute pressure ;The battery is adjacent to the switch power , and the length of the DC line is as short as possible 。1. Power equipment layout
The wireless device is facing the main walkway and is on the same straight line ;The wireless device is at an appropriate distance from the feeder window (usually ≤ 600mm),and the feeder line length should be minimized ;The installation of the wireless cabinet can be 50 to 100mm away from the wall ,wall waterproof should be done。2. Wireless equipment layout
The indoor cable rack is generally 400 mm wide ,installed above the equipment ,2300mm-2600mm from the ground, the cable rack is aligned with the front of the equipment。3. Cable rack layout400mm2300-2600mm
Cable rack strengthen:celling suspension,side support,cable rack and wall reinforcement。And usually reinforced every 1.5 meters;The cable rack is above or below the feeder windowThe ground should be laid on the rack and connected to the indoor grounding。When the DC line from the battery pack to the switching power supply is placed vertically, the vertical rack should be installed。3. Cable rack layout
The environmental monitoring box and the AC distribution box are installed near the door on the wall, and 1.4 meters away from the ground 。Wall mounting DDF or alarm box installed under
您可能关注的文档
- 二零二三年 优质公开课EnzymesdigestabsorbandmetaboliteGlossary市赛获奖.pptx
- 二零二三年 优质公开课EnzymesdigestabsorbandmetaboliteGlossary省赛获奖.pptx
- 二零二三年 优质公开课EnzymesdigestabsorbandmetaboliteGlossary.pptx
- 二零二三年 优质公开课EnzymesHowtheyworkandwhattheydo2.pptx
- 二零二三年 优质公开课EOS封装技术.pptx
- 二零二三年 优质公开课EPCGLOBAL标准体系1.pptx
- 二零二三年 优质公开课EPCRFID标准体系.pptx
- 二零二三年 优质公开课EPC参数配置.pptx
- 二零二三年 优质公开课EPC接口和协议.pptx
- EPC系统的体系结构.pptx
最近下载
- 食品生产监督检查要点_培训讲座课件.pptx
- 变更工程施工方案申请(3篇).docx VIP
- 智慧方案智慧矿山整体解决方案(41页PPT).pptx VIP
- 舒曼声乐套曲《戒指在我手上》Op.42, No.4 (Du Ring an meinem Finger)声乐+钢琴伴奏谱 带歌词.pdf VIP
- ISO11898-2中文版完整文件.docx VIP
- 职业病知识培训职业健康检查课件.pptx VIP
- 2025版《煤矿安全规程》宣贯培训课件.pptx VIP
- 球磨机安全事故案例课件.pptx VIP
- 药物不良反应的识别与处理.pptx VIP
- T_CCMA 0113-2021 高空作业车 检查与维护规程.docx VIP
文档评论(0)