- 21
- 0
- 约1.74万字
- 约 12页
- 2023-11-30 发布于上海
- 举报
Computerised System Validation
计算机系统验证
Dept.
部门:
Effective Date
生效日期: Year/ Month/月Confidential Level
机密等级:
□ Top-secret 绝密 □ Confidential 机密 □ Cryptical 秘密Distribution List?:
分发清单:
QA 部、QC 部、OSP 固体制剂部、Lo.物控部、EN 工程部、TD 技术部、EQ
设备部
Objective 目的
QA 质量保证部
Test and assessment should be taken for URS, design, purchase, installation, function, as well as process adaptability of computerizeDdataen/日d PLC control system related to GMP in compliance with this SOP so as to ensure that
computerized and PLC are fit for design requirement and stated technical criteria and are able to work stably for a long
原创力文档

文档评论(0)