- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
—V??
interoperability
《 8S
R Montana
Interoperability Montana
Risk Management Plan
RISK MANAGEMENT PLAN
Prepared by: Northrop Grumman Corporation
IM Risk Management Plan v4 O.doc
11/29/2007
NORTHROP GRUMMAN
Interoperability Montana
Risk Management Plan
Document ApprovalAndRevision History
Date Document
Version Document Revision Description Document Author 9/4/07 1.0 Original Document NGC 10/22/07 4.0 Published Document NGC
Approval
Date Approved
Version Approver Role Approver 10/22/07 4.0 Denny Espeland, Program Manager
IM Risk Management Plan v4 O.doc
11/29/2007
NORTHROP GRUMMAN
Interoperability Montana
Risk Management Plan
Table of Contents
Executive Summary 1
Purpose 2
Risk Management Strategy 2
Risk Identification 2
Risk Responsibilities 4
Risk Assessment 4
Risk Response 6
Risk Mitigation 6
Risk Contingency Planning 7
Tracking and Reporting 8
Processes to Address Immediate Unforeseen Risks 8
IM Risk Management Plan v4 O.doc
11/29/2007
NORTHROP GRUMMAN
Interoperability Montana
Risk Management Plan
Executive Summary
Risk is defined as an event that has a probability of occurring, and could have either a positive or negative impact to a project should that risk occur. A risk may have one or more causes and, if it occurs, one or more impacts. For example, a cause may be requiring an environmental permit to do work, or having limited personnel assigned to design the project. The risk event is that the permitting agency may take longer than planned to issue a permit, or the assigned personnel available and assigned may not be adequate for the activity. If either of these uncertain events occurs, there may be an impact on the project cost, schedule or performance. All projects assume some element of risk, and it,s through risk management where tools and techniques are applied to monitor and track those events that have the potential to impact the outcome of a project.
Risk management is an ongoing process that continues through the life of a proj
您可能关注的文档
最近下载
- 房屋建筑加固改造工程施工重点及难点分析与对策.pdf VIP
- 【基恩士】LR-W500(C) 使用说明书 (简体中文).pdf VIP
- 2025年全国危险化学品经营单位主要负责人考试试题含答案.docx VIP
- 依利特MFD3100多波长荧光检测器用户手册.pdf VIP
- 医疗气体系统施工的质量监控重点及监理措施(可编辑word版).doc VIP
- 《西门子接口模块 ET 200M IM 153 2 产品手册 中文超清版》.pdf VIP
- 压力性尿失禁的护理查房PPT课件.pptx VIP
- 九年级下册化学《金属》习题巩固.doc VIP
- 索尼sony_mdsje480_使用说明书手册.pdf VIP
- 城市管理网格员(中级)考试题库(浓缩300题).docx VIP
文档评论(0)