2008
2008年12月 铁道工程学报 December
增刊 JOURNALOFRAILWAYENGINEERINGSOCIETY Supplement
文章编号:1006—2106(2008)增刊2-0304—04
宝成铁路清江7号大桥地震抢险保通及思考
戴胜勇¨
(中铁二院工程集团有限责任公司, 成都610031)
提要:介绍宝成线清江7号桥在5·12地震中的灾害情况,抢险保通采取的临时加固措施和复旧情况。并对地震
区桥梁的设计提出了设计思考。
关键词:地震灾害;抢险保通;复旧加固
中图分类号:U211.9文献标识码:A
ontheNo.7
andConsideration
Rescue&Tramc—Keeping
Emergency
for in5·12
MajorBridgeBaoji-ChengduRailwayDamaged
Qin四iang
Wenchuan
Earthquake
DAI
Sheng-yong
61003
1,China)
(ChinaRailwayEryuanEngineeringGroupCo.Ltd,Chengdu,Sichuan
thedisasterofNo.7 of in5‘12
Abstract:Theintroduces
paper QingjiangMajorBridgeBaoji-ChengduRailwaydamaged
as and
Wenchuan well measuresfor restoring
Earthquake.astemporarystrengthening emergencyrescuetraffic—keeping
situation.Italso forwardtheconsiderationonthe in zone.
puts bridgedesignearthquake
and and
rescue
disaster;emergencytraffic-keeping;restorestrengthening.
Keywords:earthquake
1清江7号大桥概况
宝成线是连接西南与西北的动脉,连接陕西宝鸡与四川成都的干线铁路,全长668
通车,其中复线396km,于1993年开工建设,1999年全线开通,为我国第一条电气化铁路。
宝成线修建于上世纪50年代,当时国家无统一地震设防标准。宝成复线修建于90年,根据《中国地震烈度
区划图》和四川省(地震危险区划图),除成都青白江为7度外,其余地段均≤Vl度,抗震设防执行《铁路工程抗震
设计规范}(GBJ
11l一87》规范,桥梁工程建筑物未设防。“5·12”汶川地震发生后,在诸多铁路
您可能关注的文档
最近下载
- 2025《“混改”后的云南白药公司治理及效果分析》6700字.doc VIP
- 2025年山东理工职业学院单招《数学》检测卷(word)附答案详解.docx VIP
- 2025年山东理工职业学院单招《数学》考前冲刺练习【实用】附答案详解.docx VIP
- 新人教版九年级数学下册导学案全册.docx VIP
- (正式版)JJF(蒙) 082-2024 《旋转蒸发仪校准规范》.pdf VIP
- 国际脓毒症和脓毒性休克管理指南解读.ppt
- 七年级下册语文单元测试卷及解析.docx VIP
- 人工智能安全与伦理挑战.pptx VIP
- 2023年执业药师继续教育咽喉反流性疾病的诊治参考答案.docx VIP
- 2025年山东理工职业学院单招英语模拟试题(附答案解析) 完整版2025.pdf VIP
原创力文档

文档评论(0)