- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
THE USE OF PROGRESSIVE ASSURANCE ON THE
EAST LONDON LINE PROJECT
Dr Alastair Faulkner Mike Stubbs
CSE International Ltd Parsons Brinkerhoff
Glanford House Westbrook Mills
Bellwin Drive Godalming GU7 2AZ
Flixborough DN15 8SN, UK UK
alastair.faulkner@ stubbsm@
KEYWORDS: Assurance, progressive, controlled, acceptance, lifecycle
ABSTRACT
The East London Line Project will upgrade the existing line to national rail network standards and
procure rolling stock to facilitate the provision of a metro style service. Recognising the challenges and
nature of the project, and in order to minimise the risk of ‘failure to obtain acceptance’; the authors have
developed an approach based upon ‘Progressive Assurance’.
Progressive Assurance provides the continual development of the argument that the system has met, or is
on track to meet, its requirements through the provision of objective evidence, commensurate with the
stage in the project. In this manner technical acceptance is gained in a controlled and progressive manner.
The East London Line Project is entering the implementation phase with the appointment of contracts for
detailed design, implementation, installation, integration and acceptance. This paper describes the use of
Progressive Assurance on the East London Line Project in the organisation of existing engineering best
practice into a coherent, rational and pragmatic structure to provide, amongst other attributes, a clear
statement of acceptance criteria defined and approved early in the project lifecycle. A demonstration that
these criteria have (or will be) satisfied is made at