- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
DESIGN OF TRACTION EARTHING BONDING IN THE
St PANCRAS AREA
D Kelsey R Kadhim J Greatbanks
Rail Link Engineering AEA Technology Rail
CTRL House Central House
2 Ossulston Street Upper Woburn Place
London NW1 IHT, UK London WC1H 0JN
dxkelsey@ctrl.co.uk rafat.kadim@aeat.co.uk, james.greatbanks@aeat.co.uk
KEYWORDS: CTRL, traction, DC, earthing, bonding
ABSTRACT
The Channel Tunnel Rail Link is being built by Rail Link Engineering for Client Union Railways. It will
be Britains first major new railway for over a century - a high-speed line running for 109km (68 miles)
between St Pancras station in London and the Channel Tunnel.
A key issue is the design of traction earthing and bonding in the St Pancras area. This paper examines the
complex issues related to stray DC and touch and accessible voltages and the processes required to
achieve an acceptable design solution to compliance with the relevant national, international and
corporate standards.
INTRODUCTION
The Channel Tunnel Rail Link is being built by Rail Link Engineering for Client Union Railways. It will
be Britains first major new railway for over a century - a high-speed line running for 109km (68 miles)
between St Pancras station in London and the Channel Tunnel. The project was authorised by Parliament
with the passage of the Channel Tunnel Rail Link Act in 1996. Rail Link Engineering (RLE) are a
consortium of Arup, Bechtel, Halcrow and Systra, RLE are responsible for the delivery of the CTRL.
The new high speed line is being built in 2 Sections. Construction of Section 1 began in 1998 and was
completed in 2003, it runs between the Channel Tunnel and Fawkham Junction in north Kent
您可能关注的文档
最近下载
- 中国飞机座舱透明件行业市场占有率及投资前景预测分析报告.pdf VIP
- 静脉用药安全输注药护专家指引.pptx VIP
- 十年(2015-2024)高考英语语法填空真题与模考试卷汇编16-定语从句a原卷版(含答案).pdf VIP
- AQ 2061-2018 金属非金属地下矿山防治水安全技术规范.docx VIP
- (新)预防艾梅乙母婴传播试卷.docx VIP
- 香丽高速公路第八标段弃土场.docx VIP
- CT扫描技术模拟试题及答案、南方医科大学2006级医学影像技术学试卷.pdf VIP
- 运动生理学(全集)PPT(精品PPT).pptx VIP
- 人工智能基础与应用课件.pptx VIP
- GB 14976-2002 流体输送用不锈钢无缝钢管.pdf VIP
文档评论(0)