- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
审核QPADellCamp;ESMTTranslation.xls
Module1
RMAProcess C
ReworkRepair C
Packing C
AFT C
ICT C
MechAssy C
PostWave C
Wave C
Manual C
General Programmed Parts--SMT
General Chemical Comp.--SMT
General PCBA Inspector--SMT
General Machine Operator--SMT
General Machine Maintenance-SMT
Reflow C
Placement C
Paste C
General C
Are Daily Maintenance logs kept at the machine and are they up to date?
BGA換好後, 是否對換上的BGA照X-Ray來確認換件質量?
是否有證據證明黨BGA需要FA時,在置換前要對BGA進行緩慢烘烤 ?
是否有文件化的小錫爐設定和操作SOP?
程序是否具體說明所有錫膏的型號, 其溫度設定, 和所用助焊劑的型號?
小錫爐設定SOP是否允許作業員可以用雙手換零件?
是否定義出維修用的零件, 並且正確的保存這些零件?
維修用的零件是否原封保存直到使用?
換下來的零件是否與好的零件隔離開來並且正確的處理?
程序是否具體定義出除去殘留助焊劑的程序和化學試劑?
檢查站是否有放大和照明工具幫助作業員檢查?
Is there a revision controlled Operator Work Instruction which contains set-up information for the specific product being reflowed?
Is there a vacuum gauge on the line connected to the test system?
Is there a document which specifies the conditions for when Laser vs. Chemical Etched vs. Electroformed Nickel, should be used?
Is the Preventative Maintenance / Calibration sticker on the Test System current and up to date?
Is there a Preventative Maintenance procedure and schedule for ICT Test Systems?
Are the test systems pin electronics verified daily?
Are spare test system parts stocked?
Are spare test system pin electronics boards stocked?
Are other (not pin electronics) spare test system electronics boards stocked?
Are spare test system parts inventory adequately controlled?
4. ICT Software
Are all ICT test systems networked together and to a server?
Is the ICT software downloaded from a central server when the program is called up?
Is the ICT software revision controlled for program changes?
Is it impossible for unapproved ICT s/w changes to remain on the test system longer than 24 hours?
Is it documented that a Test Correlation exercise must be conducted between RMA Test and Dell factory Test for Dell Line Returns?
Can it be demonstrated for Dell Line Return boards, that NDFs that continue to pass all tests and special processes are held for Test Correlat
您可能关注的文档
最近下载
- 医师访谈记录.pdf VIP
- Unit 4 School Life 第3-4课时Reading and Rriting 课件 中职高一学年英语高教版基础模块1.ppt
- 最新中药饮片质量标准通则(试行).doc VIP
- 医学临床三基(输血学)-输血免疫学基础(精选试题).pptx VIP
- 我们的大脑的教学课件.ppt VIP
- 洞察世间智慧:哲学伴随我成长课件.ppt VIP
- 超星网课《汽车之旅》超星尔雅答案2023章节测验答案.doc VIP
- 老年人继承法培训课件.pptx VIP
- 科学湘科版二年级上册全册课件.pptx
- 第7课全球航路的开辟和欧洲早期殖民扩张【中职专用】《世界历史》(高教版2023基础模块).pptx VIP
文档评论(0)