PD_knowledge_rules_for_insulation_condition_assessment__of_power_cables_version_23-07-01英文资料.pdfVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
th
V Volta Colloquium on Partial Discharge Measurement
PD Measurements in the Field
PD Knowledge Rules for Insulation Condition Assessment of Distribution Power Cables
E. Gulski, F.J. Wester, J.J. Smit, E. Groot(*)
Delft University of Technology, HV Technology Management, The Netherlands
(*)InfraCore, Alkmaar, The Netherlands
1 Cable Insulation Defects
By registration of the disturbances in the power supply by network owners, statistical analysis can be
made to indicate the major failure causes in the medium voltage power network. Still a lot of the
breakdown in MV power cables are caused by non-electrical external causes. This can be damages caused
by digging activities by other companies for other types of underground cables (e.g. telephone, gas) or
caused by the movement of the soft wet ground. But
still, most of the breakdowns are caused by internal
defects in the insulation systems of the cable
network, from which the majority occur in the cable
joints. The remaining breakdowns occur in the cable
terminations and the cable insulation itself.
Visual inspection of the disturbed components gives
insight in the different types of fault causes resulting
in breakdowns. Figure C1 shows the analysis of a
disturbed mass filled cable termination, which
showed on all three phases sharp edges on the
conductor connectors to the switch gear. On the fault
place, two phases were only insulated by the plastic Figure C1: Fault cause analysis of disturbed cable
cover of the termination, resulting in a breakdown termination. Several sharp edges on the connector were
after several years, caused by PD activity from the found on all three phases.
sharp
您可能关注的文档
- High temperature assessment of nitride-based devices英文资料.pdf
- Human cognitive performance in antisubmarine warfare situation assessment and data fusion英文资料.pdf
- IAM02 - RISK ASSESSMENT CRITERIA EXAMPLES英文资料.doc
- ICT Self-Assessment Questionnai英文资料.doc
- Image Quality Assessment英文资料.pdf
- impact and consequences of school-based assessment英文资料.pdf
- Index-based_assessment_of_agricultural_drought_in_a_semi-arid_region_of_Inner_Mongolia英文资料.pdf
- Integrated Bulk Power System Risk Assessment concepts英文资料.pdf
- Intelligence and Intelligence Assessment英文资料.ppt
- IT Assessment report - outline V2.0英文资料.doc
- Performance Assessment for Web-based Systems英文资料.ppt
- Performance assessment of a novel system using parabolic trough solar collectors英文资料.pdf
- Performance assessment of video-based fire detection system in tunnel environment英文资料.pdf
- Performance assessment using a normalized gradient英文资料.pdf
- Physical Assessment and Anthropometric Measures for Use in Clinical Research Conducted in Critically Ill Patient Populations. An Analytic Observational Study英文资料.PDF
- posterior postural assessment英文资料.pdf
- POV-Procurement-Assessment-AP-Recovery-Protiviti英文资料.pdf
- Power System Operation Risk Assessment Using Credibility Theory英文资料.pdf
- Precipitation assessment of Indian summer monsoon based on CMIP5 climate simulations英文资料.pdf
- Predicting Non-sentinel Lymph Node Metastasis in a Chinese Breast Cancer Population with 1-2 Positive Sentinel Nodes. Development and Assessment of a New Predictive Nomogram英文资料.PDF
文档评论(0)