《2016 Predictive–reactive scheduling on a single resource with uncertain future jobs》.pdf

《2016 Predictive–reactive scheduling on a single resource with uncertain future jobs》.pdf

  1. 1、本文档共17页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《2016 Predictive–reactive scheduling on a single resource with uncertain future jobs》.pdf

Available online at European Journal of Operational Research 189 (2008) 1267–1283 /locate/ejor Predictive–reactive scheduling on a single resource with uncertain future jobs Bibo Yang a, Joseph Geunes b,* a Department of Logistics, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong b Department of Industrial and Systems Engineering, University of Florida, Gainesville, FL 32611, United States Received 1 October 2004; accepted 1 June 2006 Available online 24 June 2007 Abstract We consider a scheduling problem where the firm must compete with other firms to win future jobs. Uncertainty arises as a result of incomplete information about whether the firm will win future jobs at the time the firm must create a pre- dictive (planned) schedule. In the predictive schedule, the firm must determine the amount of planned idle time for uncer- tain jobs and their positions in the schedule. When the planned idle time does not match the actual requirements, certain schedule disruptions occur. The firm seeks to minimize the sum of expected tardiness cost, schedule disruption cost, and wasted idle time cost. For the special case of a single uncertain job, we provide a simple algorithm for the optimal planned idle time and the best reactive method for schedule disruptions. For the case of multiple uncertain jobs, a heuristic dynamic programming approach is presented. 2007 Elsevier B.V. All rights reserved. Keywords: Predictive–reactive scheduling; Uncertainty modeling; Project management and scheduling 1. Problem motivation and literatur

文档评论(0)

wgvi + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档