TIME STUDY.pptVIP

  1. 1、本文档共24页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
TIME STUDY.ppt

@Copyright2004 by Molex CB IE TIME STUDY Lecturer:ALEX DONG Date:APRIL-14-2004 Course:ONE HR DEFINITION Highlights: Must be a qualified, appropriate and disciplined operator. Under standard state/condition. (Method,Procedure,Machine ,Environment, ToolingFixture,Running rate, Motion) Cover due allowance(PFD). OBJECTIVES The objective: Time study is to determine reliable standards for all work,both direct and indirect,being undertaken by the enterprise for the efficient and effective management of the operation. They are the principle means for the following: OBJECTIVES Determining plant capacity. Balancing the work force with available work. Controlling production. Determining costs. Introducing a standard cost system. Introducing and maintaining an incentive wage payment system. OBJECTIVES Providing budgetary control. Introducing a supervisory bonus system. Purchasing the most productive equipment. Securing an efficient plant layout. Comparing alternative methods. Measuring the effectiveness of management. TIME STUDY EQUIPMENT Stopwatch(accurate,reliable). 1. Decimal minute stopwatch. 2. Decimal hour stopwatch. 3. Date collecting machines. 4. Videotape equipment. 5. Motion picture camera. Work study form.(see appendix 1) Electronic calculator. TIME STUDY EQUIPMENT Electronic stopwatch are commonly in use today, which read out to 0.01, and to 0.001min. REQUIREMENTS FOR T/S For Analyst: To study the existing method carefully before conducting the time study to ensure that the method is correct. To review with the sup. all aspects of the operation in order to obtain his or her endorsement of the tooling,materials, and procedure being utilized by the operator. To respond to any questions posed by the operator or sup. Regarding the T/S procedure. To record on the T/S form all details of the method under study. REQUIREMENTS FOR T/S For Analyst: To record adequate sample of element times for the eq

文档评论(0)

5566www + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6122115144000002

1亿VIP精品文档

相关文档