- 12
- 0
- 约1.42万字
- 约 9页
- 2016-05-07 发布于新疆
- 举报
英文原文
Utilisation of Data Mining in Mining Industry:
Improvement of the Shearer Loader Productivity in Underground Mines
I. INTRODUCTION
The longwall system is the heart of the coal mining process. It is considered to have a simple layout but requires stringent adherence to some basic features in the development of the panel to make it work. Similarly, in order to produce the required business production volume, all critical equipments must operate to their required level of service according to the system’s established operating mission profile. The integrated nature of production system demands that all units or sub-systems should function with acceptable level of reliability to achieve planned production. The highly productive underground longwall mining equipment is very expensive and it requires proper assessment of serviceability of each component for maintenance management. Shearer is used for getting coal in a longwall face and its breakdown is catastrophic in financial terms. Therefore, its availability is a must for the economic sustainability of the project. If the shearer is not working efficiently, this may reduce the efficiency of the entire production system [1]. In the case of the highly mechanised shearer loader, an annual coal production target of four million tons was established to achieve the annual revenue target. To achieve this level of productivity, the shearer is expected to operate at 40 weeks-operating year at 106 hours per week and allowing for only two longwall moves in a year. This tight target seems to be unrealistic considering the current
increasing failure rate of the overall system. This unreliable condition only holds true in the absence of correct and auditable strategic maintenance and reliability policy, management systems and procedures in place. In this industrial case a substantial amount of time is being put together to systematically extract the appropriate data and analyse a few factors. The factors include the cause of f
您可能关注的文档
- 26万色VGA TFT液晶单芯片低功耗驱动集成电路 毕业论文外文翻译.doc
- 51系列单片机的功能和结构 毕业论文外文翻译.doc
- A1.1模拟风力发电、太阳能发电供电系统 毕业论文外文翻译.doc
- AT89C51的概况 毕业设计文献翻译.doc
- AT89C2051单片机 毕业论文外文翻译.doc
- AT89C2051微控制器的指令 毕业论文外文翻译.doc
- AxeBot机器人:全方位自主移动机器人的机械设计 毕业论文外文翻译.doc
- BBS的发展史 毕业论文外文翻译.doc
- C2C购物网站开发 毕业论文.doc
- CAN 协议 毕业论文外文翻译.doc
- 浙江省温州市2024-2025学年七年级上学期语文期末考查卷.docx
- 精品解析:北京市建华实验学校2024-2025学年七年级下学期期中英语试题(原卷版).docx
- 精品解析:北京市通州区2024-2025学年七年级下学期期末考试英语试卷(原卷版).docx
- 精品解析:北京市回民学校2024-2025学年九年级上学期期中语文试题(解析版).docx
- 精品解析:北京市海淀区2025-2026学年九年级上学期期末语文试题(解析版).docx
- 精品解析:北京市东城区汇文中学2025-2026学年八年级上学期期中语文试题(原卷版).docx
- 精品解析:北京市回民学校2024-2025学年九年级上学期期中语文试题(原卷版).docx
- 精品解析:2024-2025学年广东省广州市从化区街口镇中心小学人教版五年级上册期中测试数学试卷(解析版).docx
- 精品解析:北京市通州区2024-2025学年七年级下学期期末考试英语试卷(解析版).docx
- 精品解析:北京市建华实验学校2024-2025学年七年级下学期期中英语试题(解析版).docx
最近下载
- JGJ-T403-2017:建筑基桩自平衡静载试验技术规程.pdf VIP
- 2023-2024学年贵州省贵阳市九年级上学期物理期末试题及答案.pdf VIP
- 地方政府大数据发展的现实与理想 .pdf
- 证券从业之证券市场基本法律法规考试题库(考点梳理).docx
- 2026年高考物理模拟试卷必刷题——匀变速直线运动的研究.docx VIP
- 环境影响评价工程师之环评法律法规题库及参考答案【精练】.docx
- 伟迪捷喷码机培训精编版.ppt VIP
- 2023年国家公务员考试题库含完整答案【夺冠】.docx
- 广东省梅州市丰顺县2024-2025学年六年级(上)期末语文试卷(有答案).pdf VIP
- 2026年高考物理模拟试卷必刷题——力学实验.docx VIP
原创力文档

文档评论(0)