- 1、本文档共27页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑工程专业英语12ConstructionSurveying研讨
Unit 12 Construction Surveying Part ⅠIllustrated Words and Concepts Figure 12-1 Elevations Determined by Transit and Leveling Rod Figure 12-2 A Plot Plan of Elevations and Location of a House Part Ⅱ Passages Passage A Construction Surveying Passage B The Survey of a Plot Plan Unit 12 Construction Surveying Part Ⅰ Illustrated Words and Concepts Figure 12-1 Elevations Determined by Transit and Leveling Rod Unit 12 Construction Surveying Part Ⅰ Illustrated Words and Concepts Figure 12-2 A Plot Plan of Elevations and Location of a House Unit 12 Construction Surveying Part Ⅱ Passages Passage A Construction Surveying The construction industry is the largest in the United States and surveying is an essential part of that industry. A boundary survey and the preparation of the necessary topographic maps is the first step in the construction process. From these maps the positions of the structures are established and when the final plans for the project are available, Unit 12 Construction Surveying Part Ⅱ Passages Passage A it is the duty of the surveyor to set the required horizontal and vertical positions for the structures. In other words, construction surveying involves the transfer of the dimensions on the drawing to the ground so that the work is done in its correct position. This type of surveying is sometimes called “setting lines and grades”. The work of the surveyor for construction projects is often referred to as layout work and the term “layout engineer” may be used in place of the term “surveyor”. Unit 12 Construction Surveying Part Ⅱ Passages Passage A Of necessity, construction surveying begins before actual construction and continues until the project is complet
文档评论(0)