Zhang Jiabu New port operation section 50000 ton Universal
berth Project Study on the evaluation and control of risk
Abstract
With the in-depth development of the reform and opening up, Chinas
modernization of the national economy continues to accelerate. The number of
projects also will be increasing rapidly, and expanding in scale. The construction
period is lengthened. Project as a collection of economic, technical, management and
organization of all aspects of integrated activities, there is uncertainty in its various
aspects, and therefore, the construction of the project is an urgent need to strengthen
risk management.
Project risk management is a systematic, dynamic activities. Risk identification,
evaluation, analysis, and control, to reduce the uncertainty in the project construction
process, in order to facilitate the smooth progress of the project. In this paper, Zhang
Jiabu Newport jobs engineering construction, the analysis of this case, the use of
empirical analysis carried out a comprehensive study of the risk management and
engineering project risk management.The paper systematically introduces the basic
meaning of risk and project risk, risk identification of project risk management, risk
assessment and analysis, risk control procedures manifestations case basis to explore
the risk and project riskmanagement of the whole process.The first chapter focuses
on risk management, and risk management of the project in the history and current
situation of the domestic and international development of project risk management.
The second chapter analyzes the concept of risk and project risk management. Focus
on the properties and classification of risk, as well as the characteristics and
management of project risk management necessity.The third chapter is to introduce
4
Zhang Jiabu Newport jobs District 5-ton general-purpose berths projects, including
the Introduction of the project, the total sum of squares of the construc