- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
0ProductivityImprovement_2007E
Productivity Improvement Project Review SBG/SBU: HTT/GTSS Revision: E Last updated:11/08/2007 What Is the Problem and Our Target? Project Background Design department reorganization Group FPY=96.6% Drawing finished in CV team is less than FE team Project Scope Design work process within CV design group Headcount limited by existing organization (10 HC) and hiring plan Business Impact Identify project saving from Productivity Improvement Increase group productivity by 20%. Quality Performance FPY=97%. Business Impact in USD Expense for every designer is $20/hour, 20% design productivity improvement within 10 head counts’ group means $118,080 saving/year. Potential impact on reducing cycle time Thought Process MAP Other CTC for reference Appendix Innovation Skill Matrix Expert list Finished drawing number in different team CV vs PV vs FE team! Per HC Workload analysis by customer Proposed new CV Design Team Group Average Drawing number per week CV 2 PV 2 FE team! 4 There is a gap between CV FE group. It maybe an opportunity for us to improve our productivity. US Pickup, CAT, Offhighway (China PE) cover 73% D M A I C * HONEYWELL - CONFIDENTIAL File Number Honeywell Confidential Problem Statement Current group productivity is 69.3% which is not enough to meet increasing business needs Project Objective Increase group productivity by 20%, (from 69.3% to 90.0%, variation =8.5%) Design Quality (FPY= 97%) Team Chart Leader: Lucy Xia (Design Engineer) Member: Charles Li (Design Engineer) Eric Li (Design Engineer) Coach: Amy Zheng (Lean Expert Candidate) Sponsor: Peter Zhang (CV Design Manager) Project Milestone Define 05/25/2007 Measure 07/13/2007 Analyze 08/17/2007 Improve 09/21/2007 Control 10/26/2007 Our Project: Productivity Improvement of CV Design Group D M A I C D M A I C How do We define “Productivity” Productivity Definition Output H
您可能关注的文档
最近下载
- 雅安编写老旧小区改造建设项目可行性研究报告.docx
- 暖通工程施工的方案.doc VIP
- 家校协同育人模式实践总结PPT模板(2025教师专用).pptx VIP
- 高处作业风险及隐患排查(安全检查)清单.pdf VIP
- 重难点拓展:有关数轴的三种探索问题-人教版新七年级《数学》暑假自学提升讲义(解析版).docx VIP
- 2021北京清华附中初一(上)期末数学.pdf VIP
- 风力发电工程项目的安全管理体系及安全管理要点.docx VIP
- 2023北京清华附中初一(上)期末数学(教师版).docx VIP
- 输电线路铁塔标准化设计110kV分册(第1~5章).docx VIP
- 2024年山西关铝集团有限公司人员招聘考试题库及答案解析.docx VIP
文档评论(0)