- 24
- 0
- 约5.31千字
- 约 7页
- 2017-03-08 发布于贵州
- 举报
电缆桥架及支架装工艺大样图
说明
1、尺寸L由工程设计冼定。
2、托臂层间距为300mm,本安装方式仅限于托臂长bl≤450mm,层数n≤2时或与其相当的情况时使用。
3、焊脚高度为4mm。
说明:1.本图为预埋件安装做法。2.b为梯架的宽度。3.本安装方式可以单排一层、两层或者三层安装,还可以双排一层、两层或三层安装。4.悬吊式异形钢双支柱在混凝土墙上安装方式参见。5.焊角高度为8mm。
/athena/offerlist/chinabesca-sale-1-true-1683341.html 桥架产品厂家信息
/Photo/ 桥架安装大样图厂家信息
of vision. 3, build, fitting in with the urban master plan in Yibin city rapid rail transit long term network, as well as the vision of Yibin city, and future development of rail transit network. 4, Yibin city, preliminary rail traffic levels service levels, system model, and technical standards. 5, to ensure that network can be implemented. 6, stable conditions for planning and supporting of Yibin city track traffic construction and formation of rail transit industry, provide conditions for the start-up and development of rail transit in Yibin city. 1.7 technical course technology is the projects research program and research ideas. Technology reflects the various stages in the process, logical relations between various levels, research, techniques and phases. Network planning process the whole process can be divided into four parts, namely, background research, network architecture research, planning and implementation of research and programming interfaces. Figure 1.7-1 Yibin city rail transit network planning technology roadmap planning interface is mainly responsible for network planning interface with follow-up planning tasks. Network planning Urban planning system in a transitional position, online network planning is completed, will be carried out as soon as possible the following planning projects: 1, detailed control of the land of rapid rail transit network planning; 2, the partitioning for network planning; 3, joint planning of rail transport and urban transport in other ways; Detailed technical courses see below. Figure 1.7-2 General technology route figure 2nd chapter City status and development planning 2.1 city basic profile 2.1.1
of vision. 3, build, fitting in with the urban m
您可能关注的文档
- 电厂给粉机变频改造方案.docx
- 电厂运行人员《规》复习题.doc
- 电压冲击测试和频电压测试价格.docx
- 电商平台app业计划书.doc
- 电商河南省建筑新技术应用示范工程申报书.doc
- 电大12秋《教设计》05任务参考答案.doc
- 电大专科基础会试题及答案(最新整理).doc
- 电大专科工商管《基础会计》试题及答案3.doc
- 电大基础会计复2010.12.doc
- 电大期末考试 科基础会计.doc
- (2026春新版)部编版八年级语文下册《第一单元》PPT课件.pptx
- 2018电力监控系统网络安全监测装置技术规范.docx
- 2022电力监控系统安全防护方案审核要点.docx
- 2014电力电缆光伏系统EN 50618欧标.docx
- (2026春新版)人教版二年级数学下册《第三单元 万以内数的认识》教案.docx
- (2026春新版)人教版二年级数学下册《第四单元 万以内的加法和减法》教案.docx
- (2026春新版)人教版二年级数学下册《综合与实践 时间在哪里》教案.docx
- (2026春新版)苏教版二年级数学下册《综合与实践 时间有多长》教案 .pdf
- (2026春新版)部编版三年级语文下册第3单元(教案).docx
- (2026春新版)部编版三年级语文下册第8单元(教案).docx
原创力文档

文档评论(0)