- 1、本文档共30页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Approval of Design Changes Modifications and Repairs
Regulatory Reform Program Proposed Design Approval Rules CASR Parts 21 and 146Ian KearsleyManager Engineering Support Section New Zealand CAA Design Delegation Holders Seminar Auckland 20 October 2005 CASR Parts related to design approvals Part 21 – Certification and airworthiness requirements for aircraft and parts Parts 22-35 and 90 Airworthiness standards Part 146 - Engineering representatives Part 43 – Maintainer’s responsibilities CASR Part 43 Maintainer’s responsibilities Set out the performance rules for modifications and repairs A person must carry out a major modification or a major repair using approved technical data: approved by or for the State of Design, or approved by or for CASA under Part 21. Minor modifications or minor repairs can be done using acceptable data, e.g. ACs, military/industry standards, manufacturer data New rule is different from current CAR 42U Major Modifications and Repairs Are defined similar to FARs – a major modification means a design change: (a) that might appreciably affect the weight and balance limits, structural strength, performance, powerplant operation, flight characteristics or other qualities affecting its airworthiness or environmental characteristics; or (b) that will be embodied on the aircraft according to non-standard practices. Require a CASA Form 337 for return to service and maintenance record CASA Form 337 is not to be used as FAA field approval system. CASR Part 21 Type certification of aircraft, aircraft engines and propellers Introduce new provision for approval of technical data for application of TCs, amended TCs, STCs Approval of parts and appliances e.g. APMAs, ATSO authorisations Approval of designs of modifications and repairs Introduce new Subpart 21.M Approval of technical data Design data Drawings and specifications Information on dimensions, materials and processes Airworthiness limitations section Operating limitations Engineering reports including test plans and test reports that
文档评论(0)