- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
6_2_Process design
Process design The process designer determines how the product and all the components will be made The sequence of operations to manufacture every part The needed machinery, equipment, tools, fixtures, and so on The sequence of operations in assembly and packout The time standard for each element of work The determination of the conveyor speeds for cells, assembly and packout lines… The balance of the work loads of assembly and packout lines Route sheets A route sheet is required for each individual fabricated part of our product. The route sheet ends with the last operation prior to being assembled with other parts. The sequence of operations as shown on the route sheet affects the proper layout of the equipment on the production floor. Two ways to change the sequence in order to make the flow through the plant smoother: Change the route sheet if possible so that the sequence of operation agrees with the other parts or the plant layout Change the physical layout of the machines so that the machines are in the correct sequence Work cell load chart Plant rate and conveyor speed Example: Charcoal grills are in cartons 30×30×24 inches high. A total of 2,400 grills are required every day. 480 minutes per 8 hour shift less 50 minutes scheduled down time 430 available minutes 80% anticipated performance 344 effective minutes of work per day ÷ 2,400 grills per day = .143 minutes per grill=7 grills per minute 7 grills per minute ×2.5 feet per grill (30 inches) = 17.5 feet per minute. Assembly line balancing SA3 could be taken off the assembly line and handled separately from the main line to save money. Given the standard time of .250 minutes for SA3, one SA3 could be assembled in .00417 hours . in an assembly line mode, operations are slowed to the rate of the slowest activity; hence, the rate of production for SA3s is dropped to only 180 pieces per hour, or .00557 hours per unit. * * 细实线:手动作业时间;虚线:机
您可能关注的文档
- 现金流折现.doc
- Financial Accounting Environment.docx
- 谢融学年论文.doc
- chapter 6-cost of capital.ppt
- 直线折旧.doc
- 指导论文2.doc
- 02 Present Value and The Opportunity Cost of Capital.ppt
- chap_6.ppt
- CAPITAL_BUDGETING.ppt
- 2006 06 strategy review -final0612.ppt
- 校信通业务.ppt
- 清华大学遗传算法PPT——cn06-basicNetDesign-v1.00.ppt
- Basic Psychology Needed for Interface Design.ppt
- basic CMOS analog ic design Lecture 1 background.ppt
- vlsi circuit design 15 analog basic circuit.ppt
- basic CMOS analog ic design Lecture 5 CMOS current sink and current mirror.ppt
- Chapter2 BasicPsychologyNeededforInterfaceDesign.ppt
- Language Design for Implementing Process Scheduling Hierarchies.ppt
- GPS测量原理与应用-讲义1-1.ppt
- 机械制图双语教学实施计划.doc
最近下载
- 人教版2024-2025(上)小学四年级上册数学单元素养评估工具(第四、六单元)(含答案).docx VIP
- 机械原理课件孙恒.pptx VIP
- 医院药品追溯管理制度.docx VIP
- 商务酒店(宾馆)消防检查全套记录表.doc VIP
- 注塑产品常见外观缺陷培训教材.ppt VIP
- 陕西省建设工程工程量清单计价规则2009(附录A).pdf VIP
- 中国华能集团的燃烧前和燃烧后CO2捕集项目.pdf VIP
- 2025中国南方电网校园招聘(综合能力)复习题库及答案.docx VIP
- 气管异物阻塞的急救讲课教案.pdf VIP
- 【中国华能集团有限公司】二氧化碳捕集与利用技术研究及工程示范.pdf VIP
文档评论(0)