网站大量收购独家精品文档,联系QQ:2885784924

ProjectProcedureManual項目管理手册.doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
ProjectProcedureManual項目管理手册

Project Procedure Manual Rev Date Description Prepared Checked Project Manager Client Disclaimer This document has been prepared on behalf of and for the exclusive use of GASAN, and is subject to and issued in accordance with the agreement between GASAN and SAMI. The information in this document may not be disclosed to, or used by any other party without SAMI’s prior written consent. 184. Hepingbei Street Shenyang, LN 110001 P.R.China Tel: +86-24Fax: +86-24Shenyang Aluminum Magnesium Engineering Research Institute Company Ltd. Table of Contents 1 EXECUTIVE SUMMARY 1 1.1 Staff Force Mobilization 1 1.2 Kick-off Meeting 1 1.3 Project Status 1 1.4 Payment 1 1.5 Key Issues and Areas of Concern 1 2 TECHNICAL QUERY 3 3 ENGINEERING 4 3.1 General 4 3.2 Achiedved This Month 4 3.3 Planed Next Month 4 4 PRICE QUOTATION 6 5 PHASE II IMPLEMENTATION PLAN 6 6 OPEN BOOK ESTIMATE 6 7 CDRL 6 文档管理部分 2 Types of documentation 2.1 Technical Documents of Project 2.1.1 Project drawings 2.1.2 Project technical documents 2.1.3 Standardized documents 2.1.4 External drawings and documents 2.2 Non-technical Documents of Project 2.2.1 Correspondence 2.2.2 Management documents 2.2.3 Commercial documents 2.3 Procedure, Planning, Instructions and Statements of Projects 3 Project Document Numbering Format 3.1 Numbering Format N refers to numeric character and A refers to alpha. 3.2 Document Numbering Elements Explanation 3.2.1 Prefix and Project Number Alpha character S = SAMI E = External (Supplier-Contractor-External Consultant) CAS = CHALIECO Six numeric characters (NNNNNN),prepared by the Project Management Department,or same as the Project Number for the preliminary project e.g. CAS1117 represents GASAN CPC Project 3.2.2 Plant Area and Package Number One alpha and three numeric characters (NANN) identified as part of plant The first numeric character represents the Project Type, refer to A

文档评论(0)

bmdj + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档