(lianrong)英语考试历年试题--整理后.docVIP

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
[1a] Management guarantees that the old system will be replaced and to consider the new proposal. [1b] Management guarantees that the old system will be replaced and that the new proposal will be considered. [2a] Use the cylinder with a diameter of 33/16 inches and 11/2 inches high. [2b] Use the cylinder with a diameter of 33/16 inches and a height of 11/2 inches. [2c] Use the cylinder that has a diameter of 33/16 inches and a height of 11/2 inches. [3a] A successful firm is capable of manufacturing a product, marketing it, and make a profit. [3b] A successful firm is capable of manufacturing a product, marketing it, and making a profit. [1] The memo was sent by the manager. [2] The manager sent the memo. [1] Any loose bubbles can be detected in this way. [2] You can detect any loose bubbles in this way. [3] The worker can detect any loose bubbles in this way. [1] The heated water is sent into the chamber. [2] The heated water flows into the chamber. [1a] The robot is used in repetitive activities. [1b] Companies use robots in repetitive activities. [2a] The ink is forced through the stencil by a squeegee. [2b] A squeegee forces the ink through the stencil.Incident ReportDate: May 16,2004To: Tom WarnerFrom: Carlos SandiaSubject: REPORT ON CHILLED WATER LEAKS IN D/823 IntroductionOn May 15,2004, a flood was reported in D/823. I was called in to repair this leak. The following is a report on my findings and maintenance activities. DiscussionAgenda8:15 p.m. The flood was reported.8:25 p.m. I arrived at D/823 and discovered that the water level in the expansion tank at HVAC unit 44 253R -01 was 4 feet above normal and the tank valve was open.8:30 p.m. A second flood was reported at HAVC unit 44 937 -01 in the same department.8:35 p.m. I shut off the open tank valves.9:00 p.m. The expansion tank levels and pressure returned to normah9:30 p.m. All leaks were secured. ConclusionThe chilled water leaks were caused by a malfunctioning level switch on the chilled water expa

您可能关注的文档

文档评论(0)

exianwhan + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档