An overview of CCS developments in Norway.PPT

  1. 1、本文档共23页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Classification: Internal Status: Draft 10 years of SLEIPNER CO2 Storage Tore A Torp, Dr.ing. Adviser CO2 Storage, StatoilHydro ASA, Norway 11 years of SLEIPNER CO2 Storage CONTENT: “Low Carbon Diet” Industrial Experiences with CO2 Sleipner, In Salah, K12B, Ketzin, Snohvit and ??? VISION Sleipner CO2 injection: - Decided in 1992 - In operation since 1996 - 1 million tonne CO2/?r Time Magazine, 17. May 2004 Previous Experiences with CO2 Injection Enhanced Oil Recovery (Texas, Hungary, Turkey, Brazil,Croatia) Natural gas cleaning Transport – Pipelines Ships Natural gas re-injection Natural gas underground storage and Beer soft drinks, dry cleaning, food packaging – Every day life Yara CO2-tankers, 1500 m3 capacity The Sleipner field – CO2 Treatment and Injection CO2 Injection Well in Utsira The Utsira Formation Time-lapse seismic datasets of CO2 stored in Utsira formation CO2 distribution June 2006 8,4 million tonnes injected over 10 years Plume area: 2,8 km2 (1,3 km2 in 2001) Plume long axis: 3760 m Maximum distance from injection point: 2560m Maximum speed of front since 2004: 250 m/year, Distance from CO2 to wells: Exploration well 15/9-13: 430m, decreasing about 12 m/year D-template: about 2 km straight west of northern plume 15/9-19 wells: about 4,5 km north of plume SACS Project 1998-2002 Demonstrations of CO2 storage Sleipner CO2 Injection SAFETY STRATEGY What is keeping the CO2 down? Trapping Mechanisms Closure - from day one –faults? Micro-pore trapping - during injection - lasting Dissolution in water - sinking to the bottom – centuries Mineral binding - precipitating solids – centuries/millennia Possible Leakage? Leakage ways? WELLS - Corrosion of cement steel Faults/Cracks – Overpressure critical Underground fluid mobility – Site specific Prevention Detection Remediation Monitoring and safety over TIME? Before start: Site selection, Planning and Risk assessment =licence During injection: Monitoring – “Wat

文档评论(0)

sd7f8dgh + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档