CONSTRUCTION WASTE MANAGEMENT PLAN
Company Name: Contact Person:
Telephone #:
Address:
Project Location:
Contractor:
Contact Person:
Telephone #:
Recycling Coordinators:
Architect:
Contact Person:
Telephone #:
Designated Recycling Coordinators:
Project Description:
Waste Management Goals:
This project will recycle or salvage for reuse a minimum of XX% by weight of the waste generated on-site.
Waste reduction will be achieved through building design, and reuse and recycling efforts will be maintained throughout the construction process.
Waste Prevention Planning:
Compliance with Chittenden Solid Waste District’s (C.S.W.D.) mandatory recycling requirements for businesses. C.S.W.D. mandatory recyclables include:
newspaper
corrugated cardboard
white and colored office paper
plastic and glass bottles and jars
metal cans
Compliance with C.S.W.D. and Vermont’s Landfill Bans, i.e. no disposal of tires, appliances, yard waste, mandatory recyclables, hazardous waste, batteries, fluorescent tubes, and large metal items.
Project Construction Documents – Requirements for waste management which will be included in all work. The General Contractor will contractually require all subcontractors to comply with the C.S.W.D. mandatory recycling requirements. A copy of this Construction Waste Management Plan will accompany all Subcontractor Agreements and require subcontractor participation.
The Construction Waste Reduction Plan shall be implemented and executed as follows and as on the chart:
Salvageable materials will be diverted from disposal where feasible.
There will be a designated area on the construction site reserved for a row of dumpsters each specifically labeled for respective materials to be received.
Before proceeding with any removal of construction materials from the construction site, Recycling Coordinators will inspect containers for compliance with C.S.W.D. requirements.
Wood cutting will occur in centralized locations
您可能关注的文档
- 2015年高中数学步步高大一轮复习讲义(文科)第九章97.DOC
- 2014年高考真题生物(江苏卷)Word版含答案.DOC
- 302723401建筑结构力学分析复习题.doc
- 2015年高中数学步步高大一轮复习讲义(文科)第十章103.DOC
- 27我多大了ppt.ppt
- 4第四步企业的人员组织.ppt
- a little noise about noise reduction ratings -.PPT
- Case study of strategic human resource managem.DOC
- capitalization rate development资本化率的发展.PPT
- chapter 10 decision making - wayne k hoy10章决.PPT
- (2026春新版)部编版八年级语文下册《第一单元》PPT课件.pptx
- 2018电力监控系统网络安全监测装置技术规范.docx
- 2022电力监控系统安全防护方案审核要点.docx
- 2014电力电缆光伏系统EN 50618欧标.docx
- (2026春新版)人教版二年级数学下册《第三单元 万以内数的认识》教案.docx
- (2026春新版)人教版二年级数学下册《第四单元 万以内的加法和减法》教案.docx
- (2026春新版)人教版二年级数学下册《综合与实践 时间在哪里》教案.docx
- (2026春新版)苏教版二年级数学下册《综合与实践 时间有多长》教案 .pdf
- (2026春新版)部编版三年级语文下册第3单元(教案).docx
- (2026春新版)部编版三年级语文下册第8单元(教案).docx
原创力文档

文档评论(0)