- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
东南亚地区的november2015,e03( southeast region, november2015, s e03)
Scope of Services Narrative
Transportation Region/Bureau
Southeast Region Solicitation ID
SE 03 Project ID(s)
1000-00-55 Solicitation Type (Roster or Open)
Roster SOLICITATION DATE
October 21, 2015 NOI DUE DATE
November 05, 2015, 12 p.m.
Location/Description
On-site Traffic Operations Signing Support
Southeast Region
Various Counties Anticipated Construction Cost:
N/A Anticipated Project Start Date:
April 01, 2016 Anticipated Completion Date:
March 31, 2017 (with up to 2 one-year renewal options) Project purpose and need
Southeast Region Traffic Operations Signing Support:
This project will provide an on-site Engineering Specialist staff to support the Southeast Region with the development and design of signing portions of improvement plans including large projects such as the Southeast Freeway Program.
Project description
This will be a period contract. The primary purpose of this contract is to provide on-site engineering support services for the WisDOT Southeast Region Traffic Operations unit for a period of up to three years. The Department will negotiate a one-year contract with an option for up to two (2) additional one (1) year renewals. The dedicated staff will be located at the Southeast Region’s Barstow Street office building in Waukesha for 40 hours per week. A field office accounting will apply to this contract.
The dedicated staff will assist the Traffic Signing and Marking Lead Worker and staff in accomplishing the following:
Preliminary Type I II sign surveys to investigate sign age and condition
Field locate and survey existing Type I II signs and document on plan sheets
Complete redline signing plans (Compose Type I II signing plans) and create miscellaneous quantity sheets including sign codes and sizes
Follow MUTCD and WisDOT operation standards
Layout sign details utilizing SignCAD
Evaluate signing needs for safety operations and guidance required
Utilize the Traffic Guidelines Manual in sign design and confer with Southeast
您可能关注的文档
- 第九章态物质( chapter9 statesof matter).doc
- 第三章–风化土-地球和空间科学( chapter3– weatheringand soils- earthand space science).doc
- 第四章-摄影( chapter4- photogrammetry).doc
- 第五我的会议( fifth i v s general meeting).doc
- 第五章-调查( chapter5- surveys).doc
- 第一部分r f p -地理西弗吉尼亚协会( part1 r f p purpose- west virginia associationof geospatial).doc
- 第一章x我- muslimphilosophy( chapter l x i i i- muslimphilosophy).doc
- 电木-亚马逊 s3( bakelite- amazon s3).doc
- 电信accessforthe deafand禁用( telecommunications accessforthe deafand disabled).doc
- 电源点模板-一个i h c( power point template- a i h c p).doc
文档评论(0)