fulltextclauses-lockheedmartin(17页)

Prime Flowdowns for Prime Contract NNG09HR00C, GOES-R Full Text Clauses E.2 REPLACEMENT OR CORRECTION OF WORK (FAR 52.246-3, Paragraph F is modified as set forth below. All other provisions of this clause remain unchanged.) (FAR 52.246-3 is already called out in Corpdocs, but this modification is applicable if the basic clause is applicable to your contract.) At any time during contract performance, but not later than launch of the spacecraft on which the defective design and or workmanship exists, unless it can be corrected from the ground and then not later than the launch of the last s