EFFLUENTREDUCTIONPROJECTSSULPHURICACID.pptVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
EFFLUENTREDUCTIONPROJECTSSULPHURICACID.ppt

EFFLUENT REDUCTION PROJECTS SULPHURIC ACID PLANT BACKGROUND INFORMATION Sulphuric acid plant in Umbogintwini . Double absorption plant, capacity of 550MTPD. Built by Simon Carves in 1973. Side stream plants such as: Liquid SO2 Plant, Liquid SO3 and Oleum plant. PRESENTATION OVERVIEW SECTION A Water consumption in acid plant. SECTION B Effluent generation from the acid plant. SECTION C Effluent reduction projects. OBJECTIVES Conduct a total water balance to identify: Projects on sustainable development of water resource, Projects on minimizing water consumption and Projects on minimizing environmentally pollution loading. Reduce the effluent volume hence costs. WATER IS A LIMITED RESOURCE Water of “good quality” is becoming a scarce resource. Water costs are rising faster than inflation. Discharge standards are becoming increasingly stringent. Treatment costs are rising faster than water costs. Industrial water reuse/recycling is neccessary WATER CONSUMPTION Demin Plant 55% Waste heat boilers Cooling towers 36% Acid dilution 5.7% Other 3.3% Durban Metro Water R6.64/m3 59 650m3/month Sand filter no.1 2 Safety showers Washing EFFLUENT GENERATION SOURCES Primary effluent plant (9 500m3/month) Demin Plant 49% Heat boilers 20% Cooling system 25% Other 3% Rain Separation tank Storm water Secondary effluent plant EFFLUENT REDUCTION PROJECTS (Implemented) Replacing co-current with counter current demin plant (2007), Automating boiler blowdown system (2007), Optimizing sandfilter backflush system (2005), Re-using the cooling tower blowdown (2006) and Recycling the condensate(2007). ……………………………………………………………………………………………. Total expenditure: R3,5m Payback period: 17 months IRR (Nominal): 70% (Real): 61% NPV: R7.96m 1. REPLACING CO-CURRENT WITH COUNTER CURRENT DEMIN P SHORT COMINGS OF CO-CURRENT DEMIN PLANT (i.e. As water quality deteriorates, it underperforms) MORE REGENS HIGH EFFLUENT MORE CHEMICALS CO-CURRENT SYSTEM V/S COUNTER CURRENT SY

文档评论(0)

381697660 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档