d t2261 programmatic environmental checklist(d t2261编程环境检查表)(7页).docVIP

d t2261 programmatic environmental checklist(d t2261编程环境检查表)(7页).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
d t2261 programmatic environmental checklist(d t2261编程环境检查表)(7页)

PROGRAMMATIC ENVIRONMENTAL CHECK LIST Wisconsin Department of Transportation DT2261 12/2006 Project ID County Funding Source ????? ????? State Only Federal Project Termini/Location ????? Estimated Project Cost - Include R/W Acquisition ????? Name of Facility to be Improved ????? Facility Classification ????? R/W to be Acquired ????? Total Acres ????? Fee Simple Acres ????? Permanent Easement Acres ????? Temporary Easement Acres Number of Buildings Acquired None ????? Vacant Buildings ????? Occupied Buildings Name of Individual Completing this Form ????? Date ????? Based on current knowledge of the proposal, I certify that to the best of my knowledge, the conditions, concerns, and issues reported on this checklist accurately reflect those affecting and affected by the proposal. (Signature) (Date) ????? (Name) ????? (Title) ????? (Organization) Description of Proposed Action - Insert project location map and other appropriate exhibits. A. Right-of-Way Acquisition Right-of-Way may be acquired by fee simple purchase, permanent or temporary easement, right of entry, gift or other device 1. Will additional right of way need to be acquired? No R/W acquired. Proceed to item B Yes – R/W to be acquired. It is strongly recommended that input be sought from real estate interests to identify issues (if any) and costs. 2. Indicate type of improvement Reconditioning (Go to question #3.) Pavement replacement (Go to question #3.) Resurfacing (Go to question #3.) Bridge rehabilitation (Go to question #4.) Minor bridge replacement (Go to question #4.) 3. For reconditioning, pavement replacement, or resurfacing projects (3R projects), sites meeting the one-half acre test must have an archival and literature search conducted to confirm there are no archaeological sites or historic buildings or structures affected by the project. See FDM Procedure 26-5-1 Will the project acquire less than 1/2 acr

您可能关注的文档

文档评论(0)

bgl001 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档