ppt课件-planned maintenance system- p bworks(- p bworks计划维护系统).pptVIP

ppt课件-planned maintenance system- p bworks(- p bworks计划维护系统).ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Planned Maintenance System Duties, Responsibilities and the 3M chain of Command SHIPBOARD ORGANIZATION DUTIES AND RESPONSIBILITIES DEPARTMENT HEAD Responsible for effective operation of the 3-M System within the department. Supervises scheduling all Maintenance Requirements (MR’s) and is responsible for all budgetary expenses to support the 3M systems. DIVISION OFFICER Trained in the 3-M System and responsible to the Department Head. Assists in managing the maintenance required for the division’s equipment, and is responsible for documentation accuracy. Conducts and manages divisional 3M training. DEPARTMENTAL 3M Responsible to 3MC and Department Head for preparation and submission of all departmental 3M reports (spot-checks, PMS, Equipment Validations, etc.). Maintains the EGL master copies for each MRC in the Department. Assists Division Officers in achieving required 3M Systems training. REPAIR PARTS PETTY OFFICER RPPO – Interfaces with Supply for ordering parts and supplies required for all associated workcenters. Conducts monthly Material Obligation Validations (MOV’s) with the Department Head to validate the continued need for parts ordered. You: the Maintenance Personnel Responsible to Work Center Supervisor (WCS). Your 3-M duties include, but are not limited to: a. Perform assigned sheduled maintenance requirements using MRC’s and Equipment Guide Lists (EGLs) as indicated by the 13 week accomplishment log and the weekly schedule. You: the Maintenance Personnel b. Performing PMS, promptly notify the WCS when: (1) Anything on an MRC is not fully understood, appears to be incorrect or cannot be accomplished as written. (2) Tools, materials, etc., prescribed by the MRC are not available. (3) Any doubt exists about capability, training, or experience to properly perform the MR as prescribed. (4) Factors exist which would make performance of the MR unwise or dangerous (e.g., disassembly of equipment needed for operations, radiation when prohibited, situatio

您可能关注的文档

文档评论(0)

heti94575 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档