- 1、本文档共27页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Design bid build--as a project delivery method
Design, Bid, BuildWhy This Method of Project Delivery?
Group 3
Michael Cascio
Angela Cavaliere
Shaoying Chen
Zhao Chen
Michael Consoli
Agenda
Introduction
Advantages of DBB
Disadvantages of DBB
The Choosing of Delivery Method in Airport Project
Trends and Conclusions
What is it?
“Traditional Method”
Owner contracts with separate entities for both the design and construction of a project
Phases of Design-Bid-Build
Design phase
Bidding Phase
Construction Phase
Design Phase
Owner selects architecture or engineering firm to design and produce documents
Design firm will work closely with owner
Identifying owners needs
Conceptual design is produced
Engineers will complete documents
I.E. Mechanical, electrical, structural engineers
Bid Phase
Two types
Open: Any qualified bidder may participate
Select: Pre-selected contractors are invited to bid
Bidding general contractors gain copies of contract documents
G.C. sends out portions of the documents to subcontractors for bids on sub-components
I.E. Concrete work, structural steel frame.
Bid Phase
G.C. then compiles all bids into a tender price for submission.
Architect reviews bids/seeks clarification
Owner and Architect discusses suitability of various bidders and their proposals
Owner is not forced to select lowest bid unless project is public
Construction Phase
Starts after project is awarded
Approvals/permits are obtained
Architect acts as owners agent
Review progress
Change orders
Requests for information
Advantages to the Owner
Early cost commitment gives owner project cost security.
Contractors bid competitively, based on complete design documents to maximize the built product for the price.
Design changes easily accommodated prior to start of construction.
Design and construction roles are clearly defined, and responsibilities and liabilities clear.
Improves decision making by the owner by providing a range of potential options.
Advantages to the Contractor
Ensures fairness to potential bidders
Design is complete p