微震技术在地下矿井安全监测的应用.pdf

微震技术在地下矿井安全监测的应用.pdf

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
微震技术在地下矿井安全监测的应用

1 Monitoring Longwall Weighting at Austar Mine Using Microseismic Systems and Stressmeters Baotang Shen 1 , Xun Luo 1 , Adrian Moodie 2 Gregory McKay 2 Abstract: Cyclic weighting is a major hazard for longwall operations in many deep mines with strong roof strata. Significant cyclic weighting events had been experienced at Austar Mine, resulting in production delays. Early warning of imminent weighting events by means of geotechnical monitoring will help to minimise the risk associated and to develop preventative solutions. This paper describes a study undertken by CSIRO and Austar Mine in which an integrated stress and microseismic monitoring system was trialled to detect strata responses to the mining processes. The main objectives of this study were to understand the caving mechanics and develop an effective early warning system for roof weighting management. The field monitoring results clearly demonstrated the effectiveness of using both stress and seismic signatures to infer longwall caving and weighting events. Stress changes recorded by stressmeters in shallow surface strata and underground roadway roofs showed a strong correlation with the chock pressure increase at the longwall face. The same phenomenon had also been observed from the recorded microseismic events. In order to develop an automated early warning method for longwall weighting, a trigger index method, which integrates the warning signs from different sensors, was developed and tested against the mine weighting observations and chock pressure data. A remarkably good agreement was achieved. For a limited number of cases examined, the warning signs from the monitoring system mostly occurred at least several hours before the roof weighting events and the major increase in chock pressure. This has demonstrated that the integrated stress and microseismic monitoring system, together with the analysis method developed, is capable of providing sufficient early w

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档