网站大量收购独家精品文档,联系QQ:2885784924

2017美赛MCM A题M奖获奖论文_.docx

  1. 1、本文档共22页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2017美赛MCM A题M奖获奖论文_

For office use onlyT1________________T2________________T3________________T4________________Team Control Number66666?Problem ChosenAFor office use onlyF1________________F2________________F3________________F4________________2017Mathematical Contest in Modeling (MCM/ICM) Summary SheetThe Kariba Dam on the Zambezi River is one of the larger dams in Africa. Its construction was controversial, and a 2015 report by the Institute of Risk Management of South Africa included a warning that the dam is in dire need of maintenance. A number of options are available to the Zambezi River Authority (ZRA) that might address the situation.It is assumed that the design parameters, site selection and construction of the dam (dam group) after repair, reconstruction and reconstruction are in accordance with the requirements of water conservancy and hydropower projects. The number and location of the dam groups are in line with the requirements of water conservancy and hydropower projects. Therefore, the research problems are: a) Comparing the comprehensive benefits of the dams after restoration, reconstruction and reconstruction, establishing the mathematical model, and expounding the costs and benefits of each case; b) Reconstructing the dams (rebuilding the existing dams 10-20 A little dam), in the drought, heavy rain, moderate rain, light rain, when the water storage, flood discharge to ensure the probability of dam break the smallest, that is, dam group risk decision optimization.For the first problem, this paper chooses the optimal cost and benefit plan for Kaliba Dam restoration work by establishing the economic benefit model, the economic loss model, the comprehensive benefit model, the absolute return model after restoration and the investment payback period model.The cost-effectiveness of the three programs was evaluated in detail according to the results of the mathematical model. Option1, the restoration of the dam can extend the useful life of 11 years. While the one-time cos

文档评论(0)

xxj1658888 + 关注
实名认证
内容提供者

教师资格证持证人

该用户很懒,什么也没介绍

领域认证该用户于2024年04月12日上传了教师资格证

1亿VIP精品文档

相关文档