VitrobotOperatingInstructions.PDFVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
VitrobotOperatingInstructions.PDF

NUANCE Center - EPIC - BioCryo Facility Vitrobot Operating Instructions Start up ? Log into FOM and start your session. ? Wear protective cloth, googles, and gloves. ? Open the main valve of the nitrogen gas cylinder. The nitrogen gas is required for operating the plunge mechanism. Also open the secondary valve on the nitrogen cylinder in case it is closed. The outgoing pressure should be around 100 PSI. ? Switch on the Vitrobot. The power switch is located at the back side of the device. ? Switch on the monitor. ? Start the VC software by double clicking the VR icon. ? If a pressure error message appears, make sure the main valve and the secondary valve of the nitrogen gas cylinder are open, and if necessary adjust the pressure with the pressure regulator to around 100 PSI. ? On the monitor select the image with the tweezer in the correct position. ? Place a twisted paper towel on each side of the specimen chamber and soak each with DI water from a squirt bottle. ? Adjust the parameters for temperature and blotting according to the requirements for your experiment. ? Click the “Place new Grid” button. ? Place the aluminum “spider”. Fill the Styrofoam cup and the metal cylinder in the center with liquid nitrogen. Be careful when handling liquid nitrogen and follow the safety standards. ? Top off the liquid nitrogen in the Styrofoam cup. From now on avoid filling liquid nitrogen into the central metal cylinder. ? After ca. 10 minutes, the central metal cylinder should be cold enough to liquefy ethane gas: Ethane is flammable, so be careful and make sure there are no sparks or open flames around (e.g. Bunsen burner). Make sure the secondary valve is closed, then open the main valve of the ethane gas cylinder. Check the pressure and adjust to around 5 PSI if necessary. ? Place the tip of the ethane

文档评论(0)

thl1006 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档