- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级经济师考试中级商业经济专业知识与实务试题
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 一级建造师建设工程经济模拟预测试卷中大网校.doc
- 一级建造师建设工程经济测试卷五.doc
- 一级建造师建设工程经济模拟预测试卷2.docx
- 一级建造师建设工程经济模拟预测试卷中大网校1.doc
- 一级建造师建设工程经济练习题1.doc
- 一级建造师建设工程经济考试真题1.doc
- 一级建造师建设工程经济考试.doc
- 一级建造师建设工程经济考试真题2.doc
- 一级建造师建设工程经济考试真题及答案.doc
- 一级建造师建设工程经济考试真题及答案1.doc
- 艾瑞咨询-2025年中国舒适眼镜白皮书.pptx
- 专题01 Units 4-6 重点语法归纳 七年级英语上学期期末考点(仁爱科普版2024).pptx
- 安全生产事故隐患大排查“百日攻坚”行动方案.PDF
- 第8课 欧洲的思想解放运动 课件高一下学期统编版(2019)必修中外历史纲要下(3).pptx
- 机械制图相关知识C语言及投影法等内容测试试卷.docx
- 第8课 欧洲的思想解放运动高一下学期统编版(2019)必修中外历史纲要下.pptx
- 第8课 现代社会的移民和多元文化 课件-高二历史统编版(2019)选择性必修三.pptx
- AIGC赋能高职“汽车新媒体营销”课程的应用探索.pdf
- 第8课 中国古代的法治与教化 课件-高三历史统编版(2019)选择性必修1一轮复习.pptx
- 21(null)大型购物中心 室内空气质量 解决方案.pdf
最近下载
- 2022年成都兴华生态建设开发有限公司招聘考试题库及答案解析.docx VIP
- 设备故障应急预案.docx VIP
- 公安刑事科学技术室等级评定办法.pdf VIP
- 【doc】某港务集团建设5万吨级通用码头工程项目可行性研究报告暨项目建.docx
- 电子设备装接工试题及参考答案.docx VIP
- 巡察组共性问题清单5个方面、19类、40种具体表现.docx VIP
- 2025贵州省粮食储备集团有限公司招聘76人笔试备考题库及答案解析.docx VIP
- 电子设备装接工(高级).doc VIP
- 2023年成都兴华生态建设开发有限公司校园招聘考试模拟试题及答案解析.docx VIP
- 《电力电子技术》课程思政教学案例.docx VIP
文档评论(0)