- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
岁的女人要读什么书调查
manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the technical requirements manufacturers drawings. Cylinder gasket on the mounting brackets supporting the Group assembled, the lugs shall be no Burr on the surface, and other debris. Department suite in place to measure surface and inner cylinder surface height difference, compared with the original values confirm the location. lower bearing and thrust bearing installation clean bearing and bearing, thrust bearing joints, clean them with a thin layer of turbine oil, and then lifting it to bits. high and middle pressure cylinder over it to the end (for high pressure rotor and low pressure change flange gasket without connection unit) rotors and rotor flange gasket connection and there is no connection, so the rotor in place cases, rotors in place must be high and middle pressure cylinder together with the Chamber over it to the end. Jack in the box that are installed on a push-pull device of adjusting the high and medium pressure cylinder to end over and around to set up indicators to monitor data, general data about the difference must not exceed 0.02mm. To prevent cylinder about out of sync over the situation, take the following measures: a) over Jack uses the same pump, evenly. B) left to set up indicators to monitor over quantity. To prevent the movement over the Chamber when the platen, at the top of the front bearing plate installed tight, then anchor base next to the corresponding
manufacturers drawings bolt fastened in the cylinder and outer cylinder. Cylinder cylinder in the drain pipe installation and measuring component leads. blade carrier, partitions and lower installation check the sealing ring of the seal and springs, which shall conform to the technical requirements manufactu
您可能关注的文档
- 安全工程师考试:《安全生产法及相关法律知识》模拟题一.doc
- 安全工程师考试安全生产法及相关法律知识真题1.doc
- 安全文明施工及环境保护措施1.doc
- 安全操作规程化工单位.doc
- 安全文明施工及环境保护保证措施(1.doc
- 安全工程师考试真题及答案安全生产技术.doc
- 安全工程师生产法及法律知识预测试题b.doc
- 安全环保中心施工部分石油天然气行业hse标准目录.doc
- 安全生产协议书与人孔桩单位.doc
- 安全生产法及相关法律知识_第四章第六节中华人民共和国合同法_版.doc
- 新高考生物二轮复习讲练测第6讲 遗传的分子基础(检测) (原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第3讲 酶和ATP(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第9讲 神经调节与体液调节(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第8讲 生物的变异、育种与进化(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(检测)(原卷版).docx
文档评论(0)