Project cost on the core ability of students.docVIP

  1. 1、本文档共14页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Project cost on the core ability of students

Project cost on the core ability of students Abstract: In view of cost engineering in our society the demand for skilled personnel has increased from quantity to quality of reality, to carry out cost engineering students in the community and the qualities of professional ability questionnaire, based on the analysis of survey results summary of proposed How to Trade Vocational Training Students constructive suggestions. Paper Keywords: vocational education in cost engineering professional quality of professional competence of social needs First, the cost of construction industry trends and status of cost engineering students to develop 1. Cost of Development of Vocational Education With China’s accession to WTO, the investment management system to a market economy, building the market demand for cost engineers, along with rapid growth, and the current relative lack of project management professionals, has attracted wide attention. As long planned economy in China and other reasons have resulted in common employees in professional knowledge is too narrow, low quality, aging and other issues, denied that the present stage of project cost management level of business compared with the international standards there is a certain gap. The most obvious is the degree of engineering know-how as abroad, and even do little actively to identify and control project cost, more difficult to find someone to optimize the design and construction organization, these show the original level of expertise not adapt to the needs of building a large market. more competitive in international markets can not adapt to the environment, so practitioners need to develop training and re-education programs, and supervise the implementation. so as to cultivate a “high intellectual energy talent. “trend from such a starting job on the cost engineers requirements of skills and expertise will be increasingly high cost engineers in addition should have the skills of engineers, qual

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档