- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
剪力墙钢筋工程量计算讲解_secret(国外英文资料)
剪力墙钢筋工程量计算讲解_secret(国外英文资料)
Chapter 3 shear wall steel bar calculation
When calculating the steel bar, the following questions should be considered: (figure 18)
What kind of reinforcement does the shear wall need to calculate?
The shear wall is mainly composed of walls, walls, beams and holes, including horizontal bars, vertical bars, tendons and holes. The wall column consists of two types: the dark column and the end column. The beams of the wall include two types of dark girders and even girders, which have a longitudinal and stirrup.
Calculating the wall of shear wall should consider the following factors: basic type, middle layer and top-level structure; The effect of wall column and wall beam on the steel bar of the wall.
(figure 18)
One, the wall is vertical to the reinforcement computation
The section of the steel bar and its name
A formula to calculate
instructions
The appended drawings
Basic plug (base plate)
When the raft foundation is less than or equal to 2000mm:
Insert foundation reinforcement length = base height - cover basic bottom bend out a + + + top surface exposed length and the upper steel bar connection (such as welding, the lap length 0)
04g101-3p45 wall
The bending length a is the same as the frame note
Figure 19
When the raft basics 2000mm:
Insert foundation reinforcement length = base bending height / 2 - layer + base + out of foundation top surface exposed length + connected to the top bars (such as welding, the lap length 0)
04g101-3p45 wall is constructed two
Figure 20
Foundation beam
When base beams and foundation plate base:
Base length = base height - protection layer + base bottom bend a + extend the top surface of the base surface plus the upper surface bar connection
04g101-3p32 wall vertical bar reinforced concrete structure
Note: if the welding is applied, the length is 0
Figure 21
When the roof of the foundation is on the top of the base board:
Base length = base height - protection layer + base bottom bend a + extend the top
您可能关注的文档
最近下载
- 引领时尚潮流的可持续时尚品牌.pptx VIP
- 一年级道德与法治教案(全套).pdf VIP
- 版鲁科版英语四年级上册教案.doc VIP
- 一种脱除1,3-丙二醇中微量醛基杂质的脱除方法.pdf VIP
- 国投证券-宁德时代-300750-全球锂电行业龙头全球化布局推动发展.pdf VIP
- 2023-2024学年上海市向明中学高二上学期10月月考数学试卷含详解.docx VIP
- 《婴幼儿动作发展与训练》教案 第8课 2~3岁幼儿精细动作的发展与训练.docx VIP
- MT-500系列说明书(济南华电)-20101216.pdf
- 养成亲社会行为++课件-2025-2026学年统编版道德与法治八年级上册.pptx VIP
- 开学第一课-初中开学第一课班会.ppt VIP
文档评论(0)