- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑B-13 建(构)筑物测量复核单(国外英文资料)
建筑B-13 建(构)筑物测量复核单(国外英文资料)
What is the copyright of zhong minrui? QQ:
Building B - 13
To construct and measure the verification list
Date of measurement: date of the year
The name of the project
The residential construction and commercial construction of A08-17 residential project in gaoqiao town (building 3).
Design units
Jiangxi provincial architectural design research institute
The construction unit
Shanghai baoxia mansion housing co., LTD
Drawing on the basis of
The total floor plan
Check the content
Set up the line to check
The test on the basis of
Planning red lines, benchmarks or datum points, import level points
Import level mark number
TP1
The leveling elevation
4.133
The unit project is plus or minus 0.000
4.85
This project is based on the plane rectangular coordinate control method,
Establish a secondary control network based on the specific situation of the site, and in the key department
Bit-encrypted control network. The location of the main building of the project is the base point
The baseline is completed once, and the internal axis is built by the crew
The total progress of the construction is conducted separately. The location of the resetting is carried out by the construction
The professional management engineer of the unit specialized technical personnel and supervising unit
In parallel, check the design unit of the fruit newspaper. Review a
The content of the process control is controlled by the process control.
Construction unit
The supervisors signature
Measurement of personnel
reviewer
Signature of the design unit
It is required to set up the line by check
Construction supervision seal
Meet the general layout requirement
Note: attached review process control content measurement date of filling: (date) (month) (year)
Building B - 13
To construct and measure the verification list
The name of the project
The residential property of no.7 residential building in jinshan district, jinshan district, Shanghai
Design units
Shanghai yaoshu