- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑专业模拟题(答案)(国外英文资料)
建筑专业模拟题(答案)(国外英文资料)
Simulation practice
Note:
There are six major problems in this paper, which is 240 points.
Questions must be answered directly in the exam paper with a blue black pen or a ballpoint pen.
3, you must use a pencil for the picture.
One, a single choice question (there are 50 choices in this big question, 2 points for each question, 100 points)
When tilting the brick wall, the projected length should not be less than the height ().
A. 1/4 B. 1/3
1/2 d. 2/3
Use the well point precipitation, should last until... (a)
The foundation of the foundation is finished
The upper part of the structure is completed
During the construction of a submerged pipe pile, if the pile is too small the most likely to occur ().
A
The tip of the pile is water in the mud
The internal vibrator is timed ()
A. slow down b. slow down
Cut it fast
P3007 indicates the composite steel template size ()
A: 300mm long, 700mm wide and 700mm long, 300mm wide
C. 750mm, wide 300mm d. long 3000mm, wide 750mm
During the construction of the post-tensioning method, the pipe time should be in ().
A. Before it condenses, it precondenses
C. when the strength reaches 15%, D
The crane is on the side of the roof of the house when the frame is on the right side. (a)
A. the string; Lower arm B. L arm
C. lower chord; Lower arm d. lower string; L arm
The following templates should be removed first in the process of dismantling. It is.
? A: the floor of the floor??? The column template??? C, beam side mode?? D. beam bottom die
The mechanical properties of the following cold-drawn steel bars are the plastic index (???). It is.
? A. Yield points and tensile strength??? Elongation and cold bending performance
? C. Tensile strength and elongation??? D. yield points and cold bending performance
10, in determining the cold pull rate, the number of pieces sampled in the same furnace with a batch of steel rods is (??? It is.
? Two??? No more than three??? No more than four??? No less than four
Using form analysis
您可能关注的文档
最近下载
- 建筑工程图集 11SG814:建筑基坑支护结构构造.pdf VIP
- 电商平台客户投诉处理协调配合措施.docx VIP
- 快速心律失常的急诊处理PPT课件.ppt VIP
- 标准图集-新型城镇化-智能灯杆.pdf VIP
- 11SG814 建筑基坑支护结构图集.docx VIP
- 2024年11月江苏苏州市中医医院(西苑医院苏州医院)招聘编外人员笔试笔试历年专业考点(难、易错点)附带答案详解 .doc
- 广西壮族自治区家庭经济困难学生认定申请表.doc VIP
- 大闽食品(漳州)有限公司企业标准.doc VIP
- 施工企业安全生产事故报告及处理制度.docx VIP
- 电商平台纠纷处理与客服投诉管理方案.docx VIP
文档评论(0)