010_砌加气砼砌块墙(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
010_砌加气砼砌块墙(国外英文资料)

010_砌加气砼砌块墙(国外英文资料) And minimize secondary reshipment. According to the size of the wall and the size of the block, arrange the layout of the building block to reduce the amount of cutting of the site as much as possible. According to the thickness of the block and the clearance height of the structure and the dimensions of the doors and Windows, the layout of the facade and section should be arranged effectively, so as to avoid waste. (3) the part of the build by laying bricks or stones aerated concrete block wall in structure on basis of + 1000 mm elevation lines hierarchical block layer, arranged mortar joint thickness of horizontal mortar joint 12-15 mm, the vertical mortar joint 15-18 mm. In the corresponding area, play the wall of the wall of the wall of the wall of the wall, and then play the facade of the reinforced concrete wall on the structural wall column. Post window position. (4) the floor MATS should be completed before the masonry, and the root of the gas wall shall be made up of three solid bricks (the height of the kick), or the concrete guide wall. (5) the interior wall on both sides of the gate can be pouring into the reinforced concrete small pillar, as the borders, exterior wall spacing by the regulation is put at the same time in the masonry concrete precast block (embedded wood brick), used for the fixed frame. (6) the day before the wall, the area of the reinforced concrete wall should be wet with the structure of the structure to ensure that the masonry is solid. (7) in case of a wall pipe, the position and size shall be checked in advance. To set aside for the main, reduce the aftershave and damage the wall. (8) according to the design requirement, preside at the structure wall column every 0. 5, 5, 5. 4. The operation process Technological process: The base processing, the building block and the door window connecting the block and the door window, the block and the floor connection (1) the primary treatment: to clean the bricks or concr

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档