- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
02658修建工程项目治理 浙江省13年10月自考 试题(国外英文资料)
02658建筑工程项目管理 浙江省13年10月自考 试题(国外英文资料)
Any solid arrow line takes both time and resources
The virtual arrow line is a virtual work that does not exist in real work, so it neither takes up time nor consumes resources
The arrow line in the network graph is a logical relation between the next job, neither taking up time nor consuming resources
If Tp = TC, the total time difference of working G is
Topic 6 figure
A. 2 B.
C. 0 6 D.
In the following options, it is not part of the construction organizations overall design
A. project b. project management system and construction plan
C. construction plan d. general floor plan
In the following options, the design quality evaluation index that does not belong to the unit project construction floor plan is
A. lower cost rate b. construction land area and construction area coefficient
C. construction site utilization d. temporary facility investment rate
The quality control that is not part of the preparation stage of the construction is covered by the scope
A. quality education and training b. technology
C. design and quality control of the quality control of the approval of the bottom and the drawing
According to article 40 of the regulations on quality management of construction projects, the minimum guarantee period for _____ is 5 years.
A. heating and cooling system b. electrical piping
C. roofing waterproofing works
Two, multiple-choice questions (8 short questions, 2 points, 16 points)
At least two of the five items listed in each of the short questions are eligible for the title, and please select the appropriate code for the answer sheet to be black. No, no, no, no, no, no.The project is the largest category in the project, divided into _____ by the manager.
A. construction project b. construction project
C. highway engineering project d. hydroelectric project
E. construction project
The organization of the project management department shall be determined according to the _____ of the construction project.
A. scale b. s
您可能关注的文档
- 构件预制及吊装施工方案(国外英文资料).doc
- 标准的完整的框架结构ansys命令流分析过程(国外英文资料).doc
- 柴油加氢事故预案(国外英文资料).doc
- 构造物台背回填(国外英文资料).doc
- 标准铜排设计的技术规范(国外英文资料).doc
- 栈桥拆除方案(国外英文资料).doc
- 桂陵之战(国外英文资料).doc
- 框架-核心筒结构高层办公楼施工组织设计(国外英文资料).doc
- 框架 opengl(国外英文资料).doc
- 框架剪力墙(国外英文资料).doc
- 03 金属资料热处理 试验三 浇注前提对铸锭组织的影响(国外英文资料).doc
- 03G101-1图集与11G101-1图集不合点(国外英文资料).doc
- 03G和11G新老图集100处不合(国外英文资料).doc
- 0322101、2班《修建结构(二)》B卷(国外英文资料).doc
- 03G101-1图集及04G101-4(国外英文资料).doc
- 03定额罕见题目解答汇总(国外英文资料).doc
- 06-07试题及谜底(国外英文资料).doc
- 03义务(国外英文资料).doc
- 06.旌旗灯号显示07-04-01(国外英文资料).doc
- 07-《修建桩基技巧标准》JGJ94-2008校勘表(国外英文资料).doc
文档评论(0)