施工组织学温习参考(国外英文资料).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
施工组织学温习参考(国外英文资料)

施工组织学复习参考(国外英文资料) Its 5 times 2 , 5 times 2 , 5 times 2 , 5 times 5 , 5 1, the parameters of flow construction: 1, process parameters: N: during the construction of running water, it is used to express the relation between the construction of water flow and the development of the process The course is called the construction process. V: the number of projects that a construction process has completed during the construction of the running water The water intensity of the construction process. Space parameters: Section a: in the construction of water construction, the activity space must be in the construction of a specialized work, This is called the work face of the work. M: in order to effectively organize water construction, the construction project is usually divided into a number of laws on the plane The construction segment, which is roughly equal to the momentum, is also known as the running water segment. Construction layer number r: the construction layer is to point to the vertical flow of the construction of the vertical flow of the multi-storey building, the construction project is in portrait It is divided into several job layers, called the construction layer. 3, time parameters: T: in the process of organizing water, a professional team is required to complete the construction of some construction section The duration of the period is called the water beat. In the construction of running water, the reasonable time interval between the two adjacent professional teams is started (there is no intermittent time), which is called the water step between them. Tj: intermittent time refers to the process or organization of the construction process The need of the two adjacent construction processes is not to be connected to the construction in time, and the time interval must be set aside for technical intervals Intermission time. TTD: after completing part of the task, the former professional team will be able to work for the latter professional team Make

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档