施工组织学温习参考(国外英文资料)
施工组织学复习参考(国外英文资料)
Its 5 times 2 , 5 times 2 , 5 times 2 , 5 times 5 , 5
1, the parameters of flow construction:
1, process parameters:
N: during the construction of running water, it is used to express the relation between the construction of water flow and the development of the process
The course is called the construction process.
V: the number of projects that a construction process has completed during the construction of the running water
The water intensity of the construction process.
Space parameters:
Section a: in the construction of water construction, the activity space must be in the construction of a specialized work,
This is called the work face of the work.
M: in order to effectively organize water construction, the construction project is usually divided into a number of laws on the plane
The construction segment, which is roughly equal to the momentum, is also known as the running water segment.
Construction layer number r: the construction layer is to point to the vertical flow of the construction of the vertical flow of the multi-storey building, the construction project is in portrait
It is divided into several job layers, called the construction layer.
3, time parameters:
T: in the process of organizing water, a professional team is required to complete the construction of some construction section
The duration of the period is called the water beat.
In the construction of running water, the reasonable time interval between the two adjacent professional teams is started
(there is no intermittent time), which is called the water step between them.
Tj: intermittent time refers to the process or organization of the construction process
The need of the two adjacent construction processes is not to be connected to the construction in time, and the time interval must be set aside for technical intervals
Intermission time.
TTD: after completing part of the task, the former professional team will be able to work for the latter professional team
Make
您可能关注的文档
- 挖沟机(国外英文资料).doc
- 挡土墙 与 块石、砖或素混凝土挡土墙的比拟(国外英文资料).doc
- 挡土墙的概述(国外英文资料).doc
- 挡土墙质量通病发生启事及防备办法(国外英文资料).doc
- 挡土墙梁板柱砼浇筑(国外英文资料).doc
- 挡墙防水计划(国外英文资料).doc
- 挡水围堰和抛石挤淤施工计划战争而安排(国外英文资料).doc
- 拉杆吊挂与推杆吊挂(国外英文资料).doc
- 挡土墙计算实例(国外英文资料).doc
- 挡水埝施工sdf(国外英文资料).doc
- 2024年江西省寻乌县九上数学开学复习检测模拟试题【含答案】.doc
- 2024年江西省省宜春市袁州区数学九上开学学业水平测试模拟试题【含答案】.doc
- 《GB/T 44275.2-2024工业自动化系统与集成 开放技术字典及其在主数据中的应用 第2部分:术语》.pdf
- 中国国家标准 GB/T 44275.2-2024工业自动化系统与集成 开放技术字典及其在主数据中的应用 第2部分:术语.pdf
- GB/T 44285.1-2024卡及身份识别安全设备 通过移动设备进行身份管理的构件 第1部分:移动电子身份系统的通用系统架构.pdf
- 《GB/T 44285.1-2024卡及身份识别安全设备 通过移动设备进行身份管理的构件 第1部分:移动电子身份系统的通用系统架构》.pdf
- 中国国家标准 GB/T 44285.1-2024卡及身份识别安全设备 通过移动设备进行身份管理的构件 第1部分:移动电子身份系统的通用系统架构.pdf
- GB/T 44275.11-2024工业自动化系统与集成 开放技术字典及其在主数据中的应用 第11部分:术语制定指南.pdf
- 中国国家标准 GB/T 44275.11-2024工业自动化系统与集成 开放技术字典及其在主数据中的应用 第11部分:术语制定指南.pdf
- 《GB/T 44275.11-2024工业自动化系统与集成 开放技术字典及其在主数据中的应用 第11部分:术语制定指南》.pdf
文档评论(0)