2011年二级建造师实务试题II及答案详解(国外英文资料).docVIP

2011年二级建造师实务试题II及答案详解(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2011年二级建造师实务试题II及答案详解(国外英文资料)

2011年二级建造师实务试题II及答案详解(国外英文资料) In 2011, the national qualification examination for second class builders was made Project management and practice simulation (2) One, a single choice question (20 questions, 1 point per problem). Only 1 of the candidates for each question is the most important. Scene (1) a teachers apartment in a city high school, the total building area of 20 000 m2, is the structure of the structure of the eight layers of cast-iron wall, the foundation is the concrete bar foundation of reinforced concrete. Construction began in March 2005 and finished in April 2006. After excavation of the foundation pit, the personnel of construction, construction, supervision, survey, design and other units have conducted the inspection. According to the scene (1), answer the following questions: The following () do not need to be checked regularly when excavation is made. A. The slope coefficient B. The grade point C. Horizontal control pile At the foundation pit, the soil layer below the base of the base below the base of the base shall be accompanied by the observation. A. drill b. drill c. dig d. ultrasonic Before the excavation of the pit, it is required () to provide the ground with underground piping and corresponding underground facilities. A. survey unit b. earthwork unit c. design unit d. construction unit The key of the pit inspection tank should be (). A. the center of the pit is the center of the pit The foundation pit method is usually based on (). A. compacted b. observed c. observed.measurement Scene (2) a 6 storey residential building. The total building area is 7 000m2, with brick and concrete structure, this apartment building has the following events. Event one: in the construction, the four layers of two beams were found to have a honeycomb and hole Completed event 2: two years later, in the flat roof eaves and the top ring beam 2 ~ 3 skin brick mortar joint of the horizontal crack, along the wall at the top of the discontinuous distribution of

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档