土方回填施工方案2(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
土方回填施工方案2(国外英文资料)

土方回填施工方案2(国外英文资料) Land reclamation construction plan RSS printing copy links large medium small release time: 2011-09-1516:50:01 A brief introduction to engineering Second, the preparation before reclamation The confirmation of the packing This project is to be used as the main source of materials for the excavation of this project, and the engineers believe that the unqualified materials will not be used. Standard compaction test Turkmen back packing is determined, the project department inspector, sampling member invited supervision engineer in backfilling yard sample, extract soil samples should be representative of every soil layer and the properties of soil should be included. The soil sample is sampled and then sent to the construction site for the standard compaction test to determine the maximum dry density of the optimum moisture content. The optimum moisture content of soil backpacking was 16.8%, and the maximum drying density was 1.71 g/cm3. Technology according to the contract terms of backfill soil compaction D of 90% or more requirements, determine the minimum of the construction control of dry density of 1.71 g/cm3 x 90% = 1.54 g/cm3, check water content and dry density curve to determine the moisture content of dry density under the qualified range of 11% to 11%. 3, field crushing test Standard compaction test is completed, the roller compaction test is arranged in the construction site, roller compaction test: (1), the purpose of verification after compaction of soil material can meet the design pressure action density values; (2) to verify the performance of the compacted machine tools for the construction requirements; (3) to select reasonable construction compaction parameters: to spread the thickness of soil, to limit the size of grain size, to the suitable range of moisture content, to compacted and compacted the number of compacts; (4) to determine the technical requirements and testing methods for quality control. Rolling test in the calibra

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档