- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
管道若何输煤(国外英文资料)
管道如何输煤(国外英文资料)
Piping coal is not new. As early as 1891, the technology for coal transmission was in the United States. The United States, however, was the first commercial coal pipeline in the world to be completed in 66 years. The small coal mine, which connects the coal plant in Georgetown, Russia, and the dongtu power plant, was shut down after five years after being hit by the CDB. Since then, for the sake of the flow of coal in Arizona, Nevada supply of coal for electricity generation, the American southern Pacific railroad through economic comparison with railway transport, built from the Philippines Sally open-pit coal mine to mo hough power plant of coal conveying pipelines across states. The pipeline was built in 1970 and is 439 kilometers long and has a coal capacity of about 5 million tons a year, which has been safe for 26 years. Meanwhile, the cost of transporting coal and the cost of power generation have dropped significantly, making the mohav power plant the second most profitable in the country. However, due to railway consortium arms against authorized coal conveying pipeline company commandeer land through legislation, more because of the railway and the traffic is very developed, no new coal conveying pipeline development.
How does the pipe lose coal
Using a pipe to transport coal, or to transport other solid minerals to a liquid medium, which is a solid and liquid to make a pulp, then reuses the pipe.
Pipeline by pulping plant, pipeline and pumping station of a coal conveying system, terminal dehydration plant of three main parts, also including water supply, power supply, communication and automatic control and other relevant facilities. First in the raw coal plant, through the preliminary separation and broken ore, in a pump barge machine processed into particle size, concentration to meet the requirements of pipeline mixed coal water slurry (coal water ratio 50% each), and then USES the multistage pump, pressed coal slurry into the pipeline
文档评论(0)