- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
长距离中压管线吹扫(国外英文资料)
长距离中压管线吹扫(国外英文资料)
Industrial technology QILU petrochemical QILU PETRO workers CH, 2E0M0IC5A, L3 3T (I1 / X) 3H: N2O9L ~ C ~ 3 Y1
Long distance medium pressure steam pipeline blowing technology to discuss
Zhang Jimei
(sinopec Zulu, shandong zibo, 2554o8)
The method of blowing and scavenging steam pipeline was developed through the analysis of the basic principle of the steam pipeline and the calculation of the technical parameters.
This paper expounds the actual problems encountered during the purge and the reason analysis, and puts forward some Suggestions for improvement. The theoretical and practical methods of blowing and scavenging steam pipeline are deepened
To know. It is of reference to improve pipeline design, construction, supervision, acceptance and the same kind of pipe sweep.
T long steam pipeline purge technique
Middle circle classification number: TQ055.8 document identification code: B article number: 1009-9859 (2oo5) O1-0029 o3
In order to excavate the potential of coal oil, it is to reduce the effect
In the second phase of the project, three steam were constructed
The pipeline is fed by the thermal power plant to the ethylene device, one of which is in the pipe
Steam piping to the device to transport industry to steam. For the high
Effect, high quality finish line purging, meet industrial turbine test
And the requirements of the safe economic operation, the purge technique of the medium pressure steam line
The operation parameters and related matters were analyzed and studied, and the implementation was made and implemented
The purge plan was a complete success.
Pipeline design parameters
The pipeline initial supply is 160t/h, pressure 4.3 MPa,
Temperature 430 C, end pressure 3.9 MPa, temperature 39012, full length
5.2 km, DN559mm diameter.
Calculation of the technical parameters of the purge
Principle of 2.1
The steam line scavenging, in effect, USES steam as motion
Force, blow the inside of the pipe, make it out of the pipe.
Whether the clutter ca
您可能关注的文档
最近下载
- 恢复执行信息登记表 (恢复强制执行申请书必备2).docx VIP
- 新版2025年《法治宣传教育法》班会.ppt
- 3.7 秋季星空(教学课件)六年级科学上册(青岛版).ppt
- 2023年机械制造行业技能考试-镗工考试考试历年重点考核试题含答案.docx VIP
- 2024-2030全球桌上角色扮演游戏(跑团)行业调研及趋势分析报告.docx
- 《旅游策划》课程标准.pdf VIP
- 2.1.2 有理数的减法(第1课时 有理数的减法法则)(教学设计) 七年级数学上册 (人教版2024).pdf
- 电机星三角启动PPT课件.pptx VIP
- 某污水站地基沉降注浆加固方案说明.doc VIP
- 3.《灭绝的生物》教学课件 青岛版科学六年级上册.pptx
文档评论(0)