- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
管理信息系统复习题三(国外英文资料)
管理信息系统复习题三(国外英文资料)
The management information system is three
One, the choice (one point, 60 points)
The following questions A, B, C, D four options, there is only one option is correct please correct option besmear is on the position of the sheet accordingly, answer not score on the test paper.
L) computer software means A
A. procedures and documentation
C. programs and comments
B. instructing system and documentation
D. instruction system and annotation
2) the computer calculates the data automatically, then outputs it to the specified execution device. What kind of domain does this belong to? C
A. science and engineering calculation
Data and information processing
B. the process control
D. artificial intelligence
3) the CPU suspends the current program and turns to the interrupt handler called C
A. interrupt request
B. interrupt handling
C. the interrupt response
Interrupt return
4) what are the two organically combined USES of virtual memory? a.
A. memory and memory
B. memory and caching
C. External storage and cache
D. memory and register
Five) multiple nodes share one communication channel, one node sends information, and the other nodes must receive information. The computer network that USES this transfer technique is D
Order A dot network
B. switched LAN
C. wan
D. radio network
6 *) the existing encryption system is divided into two types: the public key system and the C
A. asymmetric encryption
B. double key encryption system
C. symmetrical encryption system
D. the RSA system
The waterfall model software lifecycle can be divided into three phases: planning, development, and running. Which of the following is the development period? C
A. problem definition and testing
B. feasibility study and coding
C. coding and testing
D. Feasibility studies and tests
8) identify the internal process and structure of each module in the software structure diagram? C
A. demand analysis
B. the overall design
C. the detailed design
D. problem definition
Which of the following
文档评论(0)