- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
市政实务复习题(国外英语资料)
市政实务复习题(国外英文资料)
[municipal practice] full 2013
A roadbed + C miserably lime
+ C 7 at room temperature
There is no groundwater + D clay
Cement concrete + B autumn
The process of static + D sinking
The board beam + B adoption
A project department + D10
About + C reverse pocking
9 drains + D 1-3-5-4-6-2-8-7
Flexible drain pipe + D medium coarse sand
Lets put a picture of the first and the first
The following support + A is watered
Light and dark dig + D
In 2013, the management and practice of municipal public utilities were analyzed and analyzed
One, a single choice question (20, 1, 1, 1, 1, 1, 1)
In the case of the spring phenomenon, the treatment measures are ().
A. increase the power of compaction
Moderate sprinkling
C. the mixing of quicklime is firm
D. reduce the speed of roller compaction
[answer] C
This paper examines the method of foundation reinforcement. Subgrade spring occurs mainly material moisture content is too big, then need to be mixed with cement, lime or cement mortar to reinforce the foundation, thus improve the bearing capacity of foundation. See the textbook P9.
Under normal temperature, the maintenance time of cement stable soil should be at least () days.
5 A.
6 B.
7 C.
8 D.
[answer] C
It is the requirement of different grass-roots construction techniques. Cement stable soil must be moisturized and nursed, prevent and dry and wet, and it should be maintained by 7d after normal temperature, and can be put on top of it. See the textbook P12.
To excavate 4.5 m deep foundation pit in the non-groundwater homogeneous soil layer, if the top of the pit is unloaded, the slope of the foundation pit wall should not be greater than 1:1 ().
Sand soil
boulders
C. Silvery sand
Clayey soil
【 answer 】 A
The technical requirements of excavation foundation pit construction are examined. The pit depth is within 5 meters, the soil moisture is normal, the soil layer structure is even, the foundation pit pit wall slope reference table 2K312011. See the textbook P23.